My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:22 AM
Creation date
1/24/2020 2:15:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -6- <br /> S. M. S. BRINERS, INC. <br /> SURFACE IMPOUNDMENT CLOSURE <br /> SAN JOAQUIN COUNTY <br /> 8. The Discharger shall submit to the Board, for approval , a closure <br /> and post-closure maintenance plan by 1 July 1992. The closure and <br /> post-closure maintenance plans shall describe the methods and <br /> controls to be used to assure protection of the quality of surface <br /> and ground waters of the area during final operations and during any <br /> proposed subsequent use of the land. The plans shall be prepared by <br /> or under the supervision of a California registered civil engineer <br /> or certified engineering geologist. <br /> 9. The Discharger shall maintain waste containment facilities and <br /> precipitation and drainage controls, and shall continue to monitor <br /> ground water, and surface waters per Monitoring and Reporting <br /> Program No. throughout the post-closure maintenance <br /> period. <br /> 10. The post-closure maintenance period shall continue until the Board <br /> determines that the closed surface impoundments will not threaten <br /> water quality. <br /> 11 . The Discharger shall comply with the Standard Provisions and <br /> Reporting Requirements, dated 1 March 1991, which are hereby <br /> incorporated into this Order. <br /> 12. The discharger shall have the continuing responsibility to assure <br /> protection of usable waters from discharged wastes during closure <br /> and the post-closure maintenance period of the surface impoundments <br /> and during subsequent use of the property for other purposes. <br /> 13. In the event of any change in ownership of this waste management <br /> facility, the Discharger shall notify the succeeding owner or <br /> operator in writing of the existence of this Order. A copy of that <br /> notification shall be sent to the Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.