My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:22 AM
Creation date
1/24/2020 2:15:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -7- <br /> S. M. S. BRINERS, INC. <br /> SURFACE IMPOUNDMENT CLOSURE <br /> SAN JOAQUIN COUNTY <br /> 14. The Discharger shall complete the tasks outlined in these WDRs and <br /> the attached Monitoring and Reporting Program No. in <br /> accordance with the following time schedule: <br /> Task Compliance Date <br /> Ground Water Corrective Action <br /> a) Submit monitoring program as required 1 July 1992 <br /> by Section 2550.0 (f) of Chapter 15 <br /> b) Submit corrective action program as <br /> required by Section 2550.8 of Chapter 15 1 July 1992 <br /> Surface Impoundment Closure <br /> c) Submit preliminary closure plan for the <br /> surface impoundments 1 October 1992 <br /> d) Complete withdrawal of brine waste <br /> from the surface impoundments 1 June 1993 <br /> e) Complete investigation of soil beneath 1 June 1993 <br /> surface impoundments <br /> f) Submit final closure plan 1 September 1993 <br /> g) Begin construction or excavation 1 May 1994 <br /> h) Complete closure construction or <br /> excavation 1 November 1994 <br /> 15. The Discharger shall comply with all applicable provisions of <br /> Chapter 15 that are not specifically referred to in this Order. <br /> 16. The Board will review this Order periodically and will revise these <br /> requirements when necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.