My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:40 AM
Creation date
1/24/2020 2:21:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for Geotech. and Envtl.Analysis PO4-7204 <br /> SMS Briners -3 - October 2004 <br /> Chloride analysis. Samples will be submitted to certified analytical laboratories following chain-of- <br /> custody protocol. Selection of the actual samples to be tested in the laboratory and the number and <br /> type of testing will be based on the earth materials encountered and the quality of the samples <br /> retrieved. <br /> SCHEDULE <br /> Golder is proposing to perform the scope of work over 4 consecutive days. Based on inquiries with <br /> qualified subcontractors,drilling activities can commence within the next 2 weeks. <br /> Golder is prepared to implement the scope of work upon receipt of your written acceptance. We will <br /> coordinate site access with the SMS Briners staff. <br /> Our proposed schedule does not include factors beyond Golder's control, such as inclement weather, <br /> limited site access, etc. The estimated costs will increase if we start the work and are delayed by <br /> inclement weather. <br /> CLOSURE <br /> Please call if you have any questions or comments. <br /> Respectfully submitted, <br /> GOLDER ASSOCIATES INC. <br /> B.Michael acy yn,P.E. Ir JMareen A.Mathias <br /> Senior Consultant,Associate Project Engineer <br /> Attachments: Table 1 —Geotechnical and Environmental Testing <br /> Figure 1 —Proposed Field Exploration Locations <br /> Golder Associates <br /> N:WopouM04-]31M(sMs Md -Ne1d e"Ionlbnrwodphn far monty 10.18-Oq.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.