Laserfiche WebLink
Work Plan for Geotech. and Envtl.Analysis PO4-7204 <br /> SMS Briners -3 - October 2004 <br /> Chloride analysis. Samples will be submitted to certified analytical laboratories following chain-of- <br /> custody protocol. Selection of the actual samples to be tested in the laboratory and the number and <br /> type of testing will be based on the earth materials encountered and the quality of the samples <br /> retrieved. <br /> SCHEDULE <br /> Golder is proposing to perform the scope of work over 4 consecutive days. Based on inquiries with <br /> qualified subcontractors,drilling activities can commence within the next 2 weeks. <br /> Golder is prepared to implement the scope of work upon receipt of your written acceptance. We will <br /> coordinate site access with the SMS Briners staff. <br /> Our proposed schedule does not include factors beyond Golder's control, such as inclement weather, <br /> limited site access, etc. The estimated costs will increase if we start the work and are delayed by <br /> inclement weather. <br /> CLOSURE <br /> Please call if you have any questions or comments. <br /> Respectfully submitted, <br /> GOLDER ASSOCIATES INC. <br /> B.Michael acy yn,P.E. Ir JMareen A.Mathias <br /> Senior Consultant,Associate Project Engineer <br /> Attachments: Table 1 —Geotechnical and Environmental Testing <br /> Figure 1 —Proposed Field Exploration Locations <br /> Golder Associates <br /> N:WopouM04-]31M(sMs Md -Ne1d e"Ionlbnrwodphn far monty 10.18-Oq.doo <br />