Laserfiche WebLink
02!15195 08:51 $415 434 1365 GEOMATRIX SF D02iUU5 <br /> pR-14-2"9'=b X6111-1'1 rrua•. -1 - - - <br /> 1 _ <br /> ' I <br /> February 8, 1995 <br /> Chevron Pipe Line Company <br /> SOBA California Avenue 0400 <br /> Bakersfield, California 933U9-1671. <br /> f <br /> Gentlemen: i <br /> southern Pacific Transportation Company (aRailroaidn) , <br /> subject to the rollowing terms and conditions hereby permits <br /> Chevron Pipeline ccxmgany (17Chavronn) to enter upon RailrOad's <br /> property at oxo near Tracy, in the County of San Joaquin, in <br /> the state of California, in the vicinity of the intarseetion <br /> of West Byron j Road and Interstate 205. p2 i.lepost B-79.3) , for <br /> the purpo5e of conducting the sampling described in Geamatrix <br /> Consultants' Mork Flan for Screening Health Rask ASSes=ent <br /> dated July 13, 1994 (oVorkplano) , attached and made a part <br /> hereof. k <br /> 1. !in performing said work, Chevron and/Or its <br /> contractor's forces shall use only public roadways to cross <br /> from one side of Railroad's tracks to the other. <br /> 2. 'All work shall be done in a good and workmanlike <br /> manner at thelsole cost and expense Of Chevron (subject to the <br /> separata allogaticn of costs agreed to between Chevron and <br /> Railroad) . All work nec+asaary for restoration of the property <br /> as a result at any work by Chevron dt its contractors under <br /> this Agreement shall be to the reasonable satisfaction of <br /> Railroad. Chevron's installation plans Sball bm subJect to <br /> approval of 7cii,lroad. The tracks, co munication. lines and <br /> Other facilities of Milroad will not be interfered with and <br /> the work will 'be so prosecuted that there will be no <br /> interference with or delay to the operations of Railroad. <br /> 3 . 'Chevron shall obtain written content of any <br /> lessee, licensee or grantee of Railroad at the tine in <br /> Possession of !any of the Land included hereunder. <br /> 4. iJn view of the possible existence of Subsurface <br /> pipeline0 or other structures, Chevron shall, for each test <br /> hole and/or each trench, explore for such structures with hand <br /> tools to a dopth of at least eight (8) feet bolow the surface <br /> of the ground j or at Chevron's option utilize suitabl c� metal <br /> detecting equipment prior to drilling or excavating with <br /> mechanized equipment. Railroad does not warran triers are no <br /> substances below said level ,and Chevron'a operations will be <br /> subject at ali times to the liability provisions herein. <br />