Laserfiche WebLink
02/15/95 08:52 $x`415 434 1365 GEONATRI% SF Cij003/005 <br /> • !?G-1�-17A roc-y�r.-, ..... .� � _...... _.,. ...---- --. <br /> Chevron Pfpclr=-� company U <br /> = February S, 1095 <br /> Pago Z <br /> i <br /> 5. Chevron, prior to performing any digging <br /> activ.itiee on !the premises of Railroad, must call 3-8oEl-AT- <br /> riBER (avai.la4le 24 hours) to recaive a Southern Pacific <br /> TeleCOMMUnications Company control number_ chevron gill be <br /> advised iP a telecommunications system is buried anywhere on <br /> or about the premises of Railroad lit the location where <br /> Chevron will Perform such digging activities, if there is a <br /> telecommunications system, Chevron will be advised as to the <br /> owner of the telecommunications system and provided <br /> instructions on arranging for ac cable locator and will be <br /> advised wheth4r relocation or other protection for the <br /> telecommunications systms is required prior to beginning any <br /> work on the ptemises of Railroad. <br /> 61 !Chevron shall furnish Railroad vith all reports <br /> submitted to 4ny regulatory agency and any final report <br /> prepared by Chevron's contractors or consultant under this <br /> Agrec3ment (except those marked and subject to attornay/client <br /> privilege) , b providing a copy of such data and analyses to <br /> Greg shepard, Environmental Remediation Group, southern <br /> Pacific Transportation company, 2nd Floor, One Market Plaza, <br /> San Francisco„ California 94105. <br /> 7. Any contractors performing work on the promises <br /> of Railroad, aind/or persons entering the premises to rend <br /> gaugas or amy lather work on connection with this agre nt an <br /> behalf of Che,4ron shall be deemed the agents of Chevron. <br /> 8. Drilling operations in connection with test <br /> holes and/or trenches shall be no less than fifteen (15) feet <br /> from the centerline of any track and at no times dill cables <br /> or equipment §f any natvxe be located less than fifteen (15) <br /> feet from the :centerline of any track. <br /> 9. ;All open holes will be satisfactorily covered <br /> and locked at 'all times when Chevronls forces are not <br /> pbysically working in the actual, vicinity thereof. <br /> Io. llit is agreed and understood that upon C=pletion <br /> of work coverdd hereunder, Chevron will remove all e9vipment <br /> from Railroad'ls property and leave the property in a neat and <br /> safe conditiori satisfactory to Railroad. Without ].inviting the <br /> foregoing. Chevron shall remove all well casings, shall fill <br /> the borings Wath grout and shall take any additional e,ction <br /> necessary to close the wells required by state or regulation <br /> or by any governzEnt agency having jurisdiction. <br /> 12. 'chevron shall, at its expense, comply with all <br /> laws, regulations, rules and order's which are applicable to <br /> work done hereunder or result from such work, regardless of <br />