Laserfiche WebLink
a� <br /> Ms. Wendy Cohen <br /> 19 December 1994 <br /> Page 3 <br /> monitoring wells MW-2, MW-4, MW-7, and the abandonment/replacement of MW-8, MW- <br /> 11, and MW-12 (see Attachment 1: Site Map). Additionally, a groundwater monitoring well <br /> will be installed in the former location of MW-4. A discussion of the delineation of the on-site <br /> contamination will be presented in the work plan along with a description of the well <br /> abandonment and replacement procedures. Contours showing the lateral extent of <br /> groundwater impacted by petroleum hydrocarbons will also be presented to aid in the <br /> evaluation of the site. Upon completion of the site work, the distribution of hydrocarbons <br /> within the soil and groundwater will be evaluated and, if required, CPL will install additional <br /> wells in the areas of greatest soil contamination.. The work plan will be submitted to your <br /> office by 13 January 1994. <br /> It was agreed between CPL and the RWQCB-CV that any further site investigations that may <br /> be required off-site to the south would be addressed by CPL as a different site due to potential <br /> legal issues. CPL will respond to any formal request from the RWQCB-CV requiring <br /> activities with respect to the properties south of Dividend Property. <br /> i <br /> Please contact Mr. Martin Bloes (805/632-1086) or me (805/632-1046) with any remarks or <br /> questions. Your continued support on this project is appreciated. <br /> Sincerely, <br /> 4on40. 1beLrtson <br /> Environmental Specialist <br /> Enclosure (1) <br /> bloe\dividend\mrp.ltr <br /> i <br /> cc: <br /> Rick Becker - DTSC <br /> Y. May Hoe - RWQCB-CV <br /> Michael Infurna - SJV/EHS <br /> Karen Lew - Texaco Trading and Transportation Inc. <br /> Chad Naylor - Pillsbury Madison & Sutro <br /> Dawn Zemo - Geomatrix <br /> i <br /> t <br />