Laserfiche WebLink
9 r , <br /> Civic Cienzer Square <br /> 2444 Main Street. Suite 21 5 <br /> Fresno, California 93721-2734 <br /> [209) 2E4-2535 • FAX(209] 264-7431 GEOMATRIX <br /> 21 June 1994 O <br /> Project C2677C <br /> Mr. Don O. Culbertson <br /> Chevron Pipe Line Company <br /> 5080 California Avenue, Suite 400 <br /> Bakersfield, California 93309-1671 RECEIVED <br /> Subject: Groundwater Monitoring Plan J U L 0 6 1994 <br /> Dividend Property <br /> Tracy, California ENVIRONMENTAL HEALTH <br /> PERMITAERVICES <br /> Dear Mr. Culbertson: <br /> Geomatrix Consultants, Inc. is pleased to present the enclosed work plan describing a proposed <br /> groundwater monitoring program for the Dividend Property in Tracy, California. The program <br /> consists of water level measurements,groundwater sampling, and analysis of groundwater samples <br /> for volatile and semi-volatile organic compounds and petroleum hydrocarbons on a quarterly basis <br /> for one year. <br /> It is our understanding that some of the wells on the property are damaged and:not suitable for <br /> monitoring. The remaining useable wells may not provide.;adequate coverage to.meet monitoring <br /> objectives for this property. Prior to initiating the monitoring, we'willinspect the wells on the <br /> property and prepare a letter.,with our recommendations for well abandonment and/or <br /> replacement. <br /> We have scheduled our site visit and wellinspection, for mid-June 1994: .We areplanning on <br /> initiating monitoring activities in mid-July 1994. <br /> Please call if you have any questions or would like other information. <br /> Sincerely yours, <br /> GEOMATRIX CONSULTANTS, INC. <br /> William V. Pipes, <br /> Principal Geologist <br /> Enclosure <br /> cc: Karen Lew, Texaco Trading and Transportation, Inc. <br /> bcc: Karen Synowiec, Chevron Research and Technology Company <br /> Geomatrix Consultants, Inc. <br /> Engineers.G=eologists,and Environmental Scientists <br />