My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13170
>
2900 - Site Mitigation Program
>
PR0505432
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 3:08:30 PM
Creation date
1/24/2020 2:34:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0505432
PE
2960
FACILITY_ID
FA0006779
FACILITY_NAME
DIVIDEND PROPERTY
STREET_NUMBER
13170
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
13170 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r T <br /> 1°El_t � <br /> Mr. Joel Weiss �� <br /> January 3, 1996 <br /> Page 3 <br /> PROJECT SCHEDULE <br /> The most recent schedule established for completion of remediation activities and submittal <br /> of a report to the Regional Board on the results of remediation of lead impacted soil at the <br /> Old Tracy Yard (letter to Regional Board dated September 28, 1995) was December 22, <br /> 1995. Based on the project status as summarized above, and the potential for weather delays <br /> during the upcoming months, Terranext requests an extension of the completion date to <br /> March 29, 1996. This revised submittal date assumes three weeks for completion of <br /> excavation and confirmation sampling, five weeks for scheduling, loading and shipping of the <br /> existing stockpiled soil, one week for backfilling and regrading of the excavated areas, and <br /> four weeks for report preparation, SPTCo review, and submittal as a draft to the Regional <br /> Board. <br /> If you have questions regarding this matter or would like to discuss the revised completion <br /> date, please call the undersigned at (916) 369-8971 or Mr. Randall Smith at (415) 541-2559. <br /> If you are in concurrence with the revised completion date, please acknowledge by signing <br /> below and faxing a copy of this signature page to the undersigned at (916) 369-8370. <br /> Sincerely, <br /> TE EXT <br /> Richard L. Bateman, R.G. <br /> Project Manager <br /> RLB/dao <br /> cc: Mr. Randall Smith, Southern Pacific Transportation Company <br /> C Mr. Mike'Infurria,�San Joaquin County Department of Public Health <br /> Mr. Eric Garcia, Department of Toxic Substances Control <br /> ACKNOWLEDGED - CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> 469-017.Itr/01-03-96/u/kwrigh/keydata/oldtracy/letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.