Laserfiche WebLink
" I <br /> Based on review of soil analytical results from the base of'the excavation, Mr. Steve Sasson of <br /> the DEH indicated that future additional J;corrective actions will be required. at the site. i <br /> Completion of these additional corrective actions will be required after the DEH assigns a k <br /> remediation project manager to the incident. The time required by DEH to assign a.project <br /> manager to the site is based upon the case load of the managers. DEH indicated that the time <br /> : . l <br /> required for assignment of a project manager to the facility may range from one to five years. <br /> i <br /> i <br /> 5 <br />_ I <br /> N <br /> WAL=MART#2025 <br /> 98182304.236 4-2 TRACY,CALIFORNIA <br />