Laserfiche WebLink
- - <br /> di <br /> Clayton <br /> 7.1 AIR MONITORING <br /> An organic vapor meter (OVM) will be used onsite to monitor the air at the <br /> work place. If hydrocarbon odors became detectable or if these are detected with <br /> the OVM at concentratio:i of 10 ppm range in the air of total organic <br /> compounds, the personnel assigned to the project will upgrade their personal <br /> protection with half-face respirators with organic vapor type cartridges. <br /> Airborne dust will be depressed using water spray or workers will be required to <br /> wear dust masks. <br /> Workers are required to wash hands and face thoroughly after work or before <br /> meals, and to shower as soon as possible after completing onsite work for the day. <br /> This report prepared by: _ <br /> Sarni Malaeb <br /> Environmental Engineer <br /> This report reviewed by: V: <br /> Philip T. Numoto, CIH <br /> Supervisor, Industrial Hygiene Services <br /> Western Operations <br /> July 20, 1990 <br /> -S- <br /> M3LOLREP - - - - - <br />