My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012706
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
8715
>
3500 - Local Oversight Program
>
PR0545215
>
ARCHIVED REPORTS_XR0012706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 5:23:04 PM
Creation date
1/24/2020 4:48:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012706
RECORD_ID
PR0545215
PE
3528
FACILITY_ID
FA0005583
FACILITY_NAME
CARDOZA, TONY ET AL
STREET_NUMBER
8715
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
8715 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ci��n��;ftirailayton <br /> t� <br /> C0%SLLTa\t5 <br />( Soil samples selected for laboratory analysis are left in the brass liners, sealed with aluminum <br /> foil and plastic caps, taped for air tightness, labeled, and immediately placed into a pre-cooled <br /> ice chest chilled to less than 4°C. Labels contain the following information: site name, date <br /> and time sampled, borehole number and depth, and the sampler's initials. The samples are <br /> transported under chain-of-custody to a state-certified laboratory. The laboratory analyzes <br /> soil sampies within the prescribed holding time, storing them at temperatures below 4°C at all <br /> times. <br /> Pending results of laboratory analysis, excess drilling and sampling cuttings are placed into <br /> Department of Transportation (DOT)-approved drums, labeled with the name of the site, <br /> address, and well number, and left at the site. Uncontaminated soil may be disposed of by <br /> the client. Soil found to contain Ievels of contaminants above local or state action levels will <br /> require that the client dispose of it in accordance with hazardous waste regulations. At the <br /> client's request, we will assist with the disposal of contaminated soil: <br /> WELL CONSTRUMON <br /> Boreholes are converted to monitoring wells by placing 2-inch or 4-inch diameter well casing <br /> with flush-threaded joints and slotted screen into the borehole. Construction materials <br /> I include polyvinyl chloride (PVC), stainless steel, or low carbon steel. The most suitable <br /> material for a particular installation will depend on the parameters to be monitored. All <br /> i screens and casings used are in a contaminant-free condition when placed in the ground. Na <br /> thread lubrication is used, other than teflon tape, for connecting the casing segments. <br /> Wells extend at least 10 feet into the upper saturated zone but do not extend through any <br /> clay layers greater than 5 feet that are belov., the shallow water table. Factory-slotted casing <br /> j is used throughout and extends at least 2 feet above the permeable water-bearing zone. The <br /> top of the well is solid casing. The annular space of the borehole is backfilled with washed, <br /> kiln-dried sand to a point at least 1 foot above the slotted screen. A seal above the filter <br /> pack is formed by placing a 1- to 2-foot layer of bentonite pellets on top of the sand. The <br /> bentonite pellets are moistened by pouring clean tap water down the hole so that they can <br /> -* expand and seal the annulus. A neat cement grout is placed above the bentonite seal and <br /> brought to the ground surface. <br /> Well casings are protected from surface contamination, accidental damage, and unauthorized <br /> entry or tampering with water-tight locking capson the well casings. The caps are usually <br /> F surrounded by a concrete vault. Wells are clearly identified with a metal tag or other device <br /> j w' ; e the following information is recorded; well number, depth to water, depth of well, <br /> casing-data including location of screened interval. <br /> WEIJDMLOPMENT <br /> i The well seal in newly developed wells must set up for 48 to 72 hours prior to development. <br /> Since development of the well can volatilize contaminants present, the well must also settle <br />` for at least 48 to 72 hours between development and the first purging/sampling incident. <br /> -vF <br /> J All monitoring wells are initially develoed to clean the well and stabilize sand gravel, and r{ <br /> p n <br /> disturbed aquifer materials around the screened internal perforations. Wells are developed <br /> p -P 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.