Clayton <br /> CO`4tTfANT <br /> S <br /> Because of the shallow groundwater at the site, the regulatory levels established in the <br /> LUFr Manual did not apply. Before Clayton commenced excavation, we submitted a <br /> work plan for excavation and aeration of the gasoline-contaminated soil to the <br /> SJC/EHD on June 12, 1990 This plan was approved by Ms. Diane Hanson of the <br /> _ SJC/EHD <br /> Clayton completed excavation and onsite aeration of approximately 1,650 cubic yards <br /> of soil as documented in our report, Soil Excavation and Aeranon for Interland <br /> Corporation, dated October 19, 1990. On October 29, 1990, Clayton sent an <br /> Addendum to Sod Excavation and Aeration Report Dated October 19, 1990 These <br /> reports were sent to the appropriate regulatory agencies and are summarized in the <br /> w following subsections. ; <br /> i <br /> Y 4.1 EXCAVATION AND SAMPLING <br /> Soil excavation started on July 23, 1990, near the gasoline island concrete pad, which <br /> _W was still in place. Fuel Oil Polishing Company excavated the soil using a Case <br /> excavator, a 12-yard dump truck, and a Case 450 truck loader. Clayton monitored r <br /> excavated soils with an organic vapor meter (OVM) <br /> i <br /> 4.1.1 Initial bicatvadan <br /> F j � <br /> } Clayton mcratored excavation to approximately 10.5 feet The sod at 10 5 feet <br /> appeared to be free of contamination based on visual observations and readings from t <br /> ,.�.., the OVM. At 10 5 feet the water table was visible in some spots, although it was not <br /> continuous. <br /> t` Initially, approximately 1,000 cubic yards of soil were excavated. We collected seven <br /> soil samples from the base of the walls of the excavation and one water sample on the <br /> fullowing dates: <br /> e July,23.1990. SW-1 and SE-1 <br /> o MW-1, NW-1, MN-1, NE-1, ME-1, and H.0-1 <br />�- The soil samples were atia►wzed by the following methods: <br /> a EPA Method 5030!8015-5020, for gasoline and BTEX <br /> • EPA Method 418.1, for total recoverable petroleum hydrocarbons as oil and grease <br /> Y <br /> The water sample was analyzed by EPA Method 418.1 only. <br /> Figure 3 prcnides a sample location diagram. Table 4 is a summary of the analytical <br /> -� results. Notable results are listed below <br /> f <br /> 'i; • Concentrations of petroleum hydrocarbons from the southern and western sides of <br /> L: the excavation (SW-1, SE-1, MW-1, and NW-1) were below the remedial objectives. <br /> • Concentrations of petroleum hydrocarbons from the northern and eastern walls of <br /> the excavation were above the remedial objectives. <br /> 5 <br /> »tom <br />