My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002150
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
8715
>
3500 - Local Oversight Program
>
PR0545215
>
ARCHIVED REPORTS_XR0002150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 9:20:36 AM
Creation date
1/27/2020 9:07:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002150
RECORD_ID
PR0545215
PE
3528
FACILITY_ID
FA0005583
FACILITY_NAME
CARDOZA, TONY ET AL
STREET_NUMBER
8715
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
8715 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clayton <br /> CO`4tTfANT <br /> S <br /> Because of the shallow groundwater at the site, the regulatory levels established in the <br /> LUFr Manual did not apply. Before Clayton commenced excavation, we submitted a <br /> work plan for excavation and aeration of the gasoline-contaminated soil to the <br /> SJC/EHD on June 12, 1990 This plan was approved by Ms. Diane Hanson of the <br /> _ SJC/EHD <br /> Clayton completed excavation and onsite aeration of approximately 1,650 cubic yards <br /> of soil as documented in our report, Soil Excavation and Aeranon for Interland <br /> Corporation, dated October 19, 1990. On October 29, 1990, Clayton sent an <br /> Addendum to Sod Excavation and Aeration Report Dated October 19, 1990 These <br /> reports were sent to the appropriate regulatory agencies and are summarized in the <br /> w following subsections. ; <br /> i <br /> Y 4.1 EXCAVATION AND SAMPLING <br /> Soil excavation started on July 23, 1990, near the gasoline island concrete pad, which <br /> _W was still in place. Fuel Oil Polishing Company excavated the soil using a Case <br /> excavator, a 12-yard dump truck, and a Case 450 truck loader. Clayton monitored r <br /> excavated soils with an organic vapor meter (OVM) <br /> i <br /> 4.1.1 Initial bicatvadan <br /> F j � <br /> } Clayton mcratored excavation to approximately 10.5 feet The sod at 10 5 feet <br /> appeared to be free of contamination based on visual observations and readings from t <br /> ,.�.., the OVM. At 10 5 feet the water table was visible in some spots, although it was not <br /> continuous. <br /> t` Initially, approximately 1,000 cubic yards of soil were excavated. We collected seven <br /> soil samples from the base of the walls of the excavation and one water sample on the <br /> fullowing dates: <br /> e July,23.1990. SW-1 and SE-1 <br /> o MW-1, NW-1, MN-1, NE-1, ME-1, and H.0-1 <br />�- The soil samples were atia►wzed by the following methods: <br /> a EPA Method 5030!8015-5020, for gasoline and BTEX <br /> • EPA Method 418.1, for total recoverable petroleum hydrocarbons as oil and grease <br /> Y <br /> The water sample was analyzed by EPA Method 418.1 only. <br /> Figure 3 prcnides a sample location diagram. Table 4 is a summary of the analytical <br /> -� results. Notable results are listed below <br /> f <br /> 'i; • Concentrations of petroleum hydrocarbons from the southern and western sides of <br /> L: the excavation (SW-1, SE-1, MW-1, and NW-1) were below the remedial objectives. <br /> • Concentrations of petroleum hydrocarbons from the northern and eastern walls of <br /> the excavation were above the remedial objectives. <br /> 5 <br /> »tom <br />
The URL can be used to link to this page
Your browser does not support the video tag.