My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SHEA HOMES OM TRANSMITTAL LETTER WITH O&M
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GREAT VALLEY
>
0
>
2900 - Site Mitigation Program
>
PR0542222
>
ARCHIVED REPORTS_SHEA HOMES OM TRANSMITTAL LETTER WITH O&M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:29:22 PM
Creation date
1/27/2020 2:29:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SHEA HOMES OM TRANSMITTAL LETTER WITH O&M
RECORD_ID
PR0542222
PE
2959
FACILITY_ID
FA0024253
FACILITY_NAME
MOUNTAIN HOUSE DEVELOPERS-SHEA HOMES
STREET_NUMBER
0
STREET_NAME
GREAT VALLEY
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
02
SITE_LOCATION
GREAT VALLEY PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Operations and Maintenance Plan <br /> Neighborhood C,Great Valley Parkway <br /> Mountain House,San Joaquin County,California <br /> Page 4-1 <br /> 4.0 DEED RESTRICTION REQUIREMENTS <br /> The term "Owner" as it appears in this Plan is currently defined as Mountain House Developers, LLC, <br /> and at a future time to be determined, will be defined as the Mountain House Community Services <br /> District (MHCSD). The Owner will be responsible for all Operations and Maintenance Activities. The <br /> following administrative rules shall apply: <br /> 1) The Owner shall give DTSC at least sixty (60) days of advance written notice prior to the <br /> intended date of any proposed modifications to the asphalt cover. General maintenance of <br /> slurry seal or crack filling does not constitute modifications. The written notice to DTSC <br /> shall include a detailed description of the work to be done or modifications to be made and a <br /> map showing the exact location of the proposed work and the reasons for modifications or <br /> disruption. No excavation work or soil disturbance activities shall occur directly in the <br /> Remediation System without prior approval by DTSC and the Owner. The work plan shall <br /> first be reviewed by a licensed Civil Engineer. <br /> 2) The asphalt cover shall be maintained in a manner to ensure that the public does not come <br /> into contact with the contaminated soil. Under no circumstances will the cover remain in <br /> disrepair for a period longer than ninety (90) days following discovery of damage. Further, <br /> the condition of the cover and any required maintenance shall be evaluated as part of the <br /> annual inspection. <br /> ow 1;kil;� <br /> IL 4) CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.