My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002242
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
3500 - Local Oversight Program
>
PR0545205
>
ARCHIVED REPORTS_XR0002242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:41:16 PM
Creation date
1/27/2020 3:19:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002242
RECORD_ID
PR0545205
PE
3528
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r t <br /> i <br /> 5 .7 Groundwatta Sample Analysis <br /> The groundwater sample collected from monitoring well MW-6 was <br /> analyzed by Kiff for TPH-G, BTEX, and the fuel oxygenates MTBE, TBA, <br /> TAME, DIPE and ETBE by EPA Method 8260. Analytical results are tabulated <br /> in Table Three. The laboratory analytical report and chain of custody <br /> documents are presented in Appendix G. <br /> The groundwater sample collected from monitoring well MW-6 contained <br /> 67 ppb TPH-G and 1.4 ppb MTBE. No other compounds were detected <br /> above laboratory reporting limits. <br /> i <br /> 6 . 0 INSTALLATION OF EXTRACTION AND AIR SPARGE WELLS <br /> 6- 1 Drilling Permits <br /> Prior to drilling, ASE obtained a drilling <br /> Permit from the San Joaquin <br /> County PHS-EHD (Appendix Q. ASE also notified USA to have <br /> underground public utilities in the vicinity of the site marked prior t o <br /> drilling. <br /> 4 6"2 Groundwater Extraction Well 1nS gelation <br /> I ASE installed extraction well EW-1 to provide a large diameter well to <br /> conduct a pumping test. Details of the well construction are presented <br /> below. <br /> 6. 2. 1 Drill a Boring for the Installation -of a -Groundwater Extraction Well <br /> On August 15, 2001 , Gregg Drilling of Martinez. California drilled boring <br /> I EW-1 at the site using a, Mobile 13-61 drill rig equipped with 12-inch <br /> diameter hollow-stem augers (Figure 4). Groundwater extraction well <br /> EW-] Nvas subsequently constructed . in this borj112. The drilling, Was <br /> directed by ASE associate geologist Erik Paddleford. <br /> Undisturbed soil samples were collected every 5-feet as drilling <br /> progressed for lithologic and hydrogeologic description„ and for possible <br /> chemical analysis. The samples were collected by driving a split-barrel <br /> sampler lined with 6-inch diameter brass tubes usinC7 repeated blows from <br /> a 140-lb haninler dropped 30-inches. Selective soil samples were <br /> immediately trimmed, sealed with Teflon tape and plastic end caps, <br /> labeled, and stored on ice for transport to Kiff tender chain of custody. <br /> Soil from the remaining tubes was described by the site geologist using <br /> 574 West Grant line Road CAP — January 2002 <br /> " -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.