Laserfiche WebLink
1 <br /> 1 <br /> 03 March 1999 <br /> AGE-NC Project No 95-0111 <br /> Page 4 of 4 <br />' of dissolved hydrocarbons has possibly been reduced <br /> • RelativeIy high concentrations of TPH-d in MW-4 and MW-5 may demonstrate the presence <br />' of a persistent plume of dissolved diesel fuel in ground water <br /> • The cross-gradient extent of the TPH-d and TPH-g impacted ground water is not known <br /> 1 <br /> 5.0. RECOMMENDATIONS <br /> Based on present site conditions, AGE recommends <br />' Additional monitoring wells have been installed east of MW-5 along Grant Line�Road and <br /> west of wells MW-1 and MW-4 Construction details will be reported in the next quarterly <br />' report <br /> • Quarterly monitoring and sampling should continue at the site The next quarterly monitoring <br />'• should be scheduled for March <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologiclhydrogeologic <br />' conditions at the site for the purpose of this investigation were made from a limited number of <br /> available data points (i a ground water monitoring well samples) and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br />' professional recommendations contained in this report <br /> 1 <br /> 1 <br /> 1 <br /> Advanced GeoEnvironmental Inc. <br />