Laserfiche WebLink
i <br /> Alternatives Al, A2, and A3 address removal of the soil source that contributes to the petroleum <br /> hydrocarbons detected in the groundwater at this facility Table 7 presents a comparison of the <br /> cost, mass removed, and cost per pound of TPH removed for each alternative in the October <br /> 2004 CAP and in this Addendum The most effective alternatives are Al, A2, and A3, as shown <br /> below <br /> Alternative <br /> Al A2 A3 <br /> ' Excavation Removal of Excavation 5' Into Excavation 14'-17'lnto <br /> TPH to 500 mglkg 14'-17' Watertable Laterally to Watertable Laterally out to <br /> Into Watertable MW-3 MW-3 <br /> Cost $254,500 to$298,500 $151,000 to $183,000 $276,300 to $322,500 <br /> Pounds TPH To <br /> [9 d) 11,300 lbs TPH(g+d) 10,200 lbs TPH(g,d) 11,600 Ibs TPH(g.dp <br /> Be Removed <br /> Cost per Pound of $22 4011b to $26 3011b $14 8011b to $18 00/1b $23 7011b to $27 7011b <br /> TPH(G-D) Removed TPH(g,d) TPH(g+d) TPH(g«d) <br /> Alternative A2 --Removal of soil at the soil/ground water interface and in the top 5 feet of the <br /> water table-- is the most cost-effective solution as the costs of shoring are avoided and the <br /> hydrocarbon mass removed is comparable to those alternatives with shoring The removal <br /> efficiency of Alternative A2 addresses the free product and petroleum material at the soil/water <br /> interface and contamination in the five feet of the water table Alternative A2 removes the mass <br /> reasonably accessible and provides the same remedial action time as the more expensive CAP <br /> ' Options, such as Alternatives 3, 4 and 5 The addition of calcium peroxide will provide an <br /> oxygen source to enhance degradation of the residual Alternative A2 is the most cost-effective <br /> with regard to cost per pound of TPH removed because Alternative A2 removes 87% of the TPH <br /> associated with Alternative Al or A3 at a much lower cost The driving factor in the cost <br /> difference between these options is primarily related to shoring costs Based upon this analysis, <br /> Alternative A2 is the recommend remedial action <br /> 20 <br /> R 1C0NTGRANIstock1onlCAKCAP ADDENDUM <br />