My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0517454
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:29:17 PM
Creation date
1/29/2020 4:02:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517454
PE
2960
FACILITY_ID
FA0013435
FACILITY_NAME
SHELL PIPELINE (FORMER)
STREET_NUMBER
24550
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
24550 HANSEN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2 HEALTH AND SAFETY PLAN(HASP) <br /> CRA will prepare a HASP to protect site workers. The plan will be kept on site during <br /> field activities and will be reviewed and signed by each site worker. <br /> 2.3 UTILITY CLEARANCE <br /> CRA will mark the proposed drilling locations,and the locations will be cleared through <br /> Underground Service Alert and a private line locator service prior to drilling. <br /> Additionally,the first 5 feet of each boring will be cleared using an air-knife to minimize <br /> potential damage to underground structures not identified through prior utility locating <br /> activities. <br /> CRA reviewed Shell Oil Company as-built drawings that show the former pipelines <br /> consisted of one 8-inch line and one 10-inch line (Appendix A). The lines were spaced <br /> approximately 3 feet apart. The drawings indicate that both pipelines were removed in <br /> Section 26. The 8-inch line was removed in Section 22, however, the 10-inch line was <br /> abandoned in place. Prior to drilling, the line locator service will be used to verify the <br /> location of the 10-inch line. <br /> 2A SURVEY OF FORMER PIPELINE RIGHT-OF--WAY <br /> Prior to drilling,a licensed surveyor will survey the former pipeline ROW location and <br /> the proposed borehole locations. After drilling,the surveyor will survey the locations of <br /> any additional borings advanced during the drilling phase. <br /> 2.5 SUBSURFACE INVESTIGATION <br /> In the absence of subsurface utility conflicts, 22 soil borings will be drilled and sampled <br /> at the locations shown on Figure 3. The borings will be located approximately midway <br /> between the two pipelines (or former pipeline locations) and spaced on 300 ft intervals. <br /> The borings will be drilled using track-mounted direct push and/or hollow-stem auger <br /> drilling equipment. <br /> The proposed investigation will assess subsurface conditions beneath the former <br /> pipeline ROW where future construction activities are planned. Soil samples will be <br /> ccoaaa(ia) 2 CONESTOGA-ROVERS&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.