Laserfiche WebLink
Ground Zero Analysis,Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> Task(s) Hazard Mitigation Measure <br /> 1 Heavy Equipment INoise & Physical All heaW equipment used on this project will be in <br /> contact) good working order and operated in accordance <br /> with recognized industry standards and Cal-OSHA <br /> Title 8, Subchapter 4, Construction Safety Orders. <br /> In addition, an exclusion zone applies to all <br /> personnel. The exclusion zone will be 20 feet to <br /> the front and either side of the operating drill rig. <br /> Personnel will not be allowed under booms or <br /> augers at any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment will <br /> be supplied with ear protection. <br /> 1 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity. In addition, water will be <br /> applied to control the dust if visible levels of dust <br /> are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> Flammable (Flash Point <140 °F) Combustible (Flash Point <200 °F) <br /> Gasoline <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> Dry chemical fire extinguishers Class A B and C are stored in all GZA vehicles. <br /> PAGE 4 <br />