My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1140
>
2900 - Site Mitigation Program
>
PR0527227
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:56:42 PM
Creation date
1/29/2020 4:29:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527227
PE
2950
FACILITY_ID
FA0005390
FACILITY_NAME
KNOWLES PROPERTY
STREET_NUMBER
1140
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749026
CURRENT_STATUS
01
SITE_LOCATION
1140 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis,Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> Task(s) Hazard Mitigation Measure <br /> 1 Heavy Equipment INoise & Physical All heaW equipment used on this project will be in <br /> contact) good working order and operated in accordance <br /> with recognized industry standards and Cal-OSHA <br /> Title 8, Subchapter 4, Construction Safety Orders. <br /> In addition, an exclusion zone applies to all <br /> personnel. The exclusion zone will be 20 feet to <br /> the front and either side of the operating drill rig. <br /> Personnel will not be allowed under booms or <br /> augers at any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment will <br /> be supplied with ear protection. <br /> 1 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity. In addition, water will be <br /> applied to control the dust if visible levels of dust <br /> are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> Flammable (Flash Point <140 °F) Combustible (Flash Point <200 °F) <br /> Gasoline <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> Dry chemical fire extinguishers Class A B and C are stored in all GZA vehicles. <br /> PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.