My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 9:21:34 AM
Creation date
1/30/2020 8:34:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND ZERO ANALYSIS, INC. ,Q? 7 <br /> 38 <br /> 1714 Main Street <br /> Escalon, California 95320-1927 <br /> Telephone: (209)838-9888 <br /> Facsimile: (209)838-9883 <br /> August 9, 2001 <br /> Mr. Harlin Knoll <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Subject: Workplan for Abandonment of Wells MW6 through MW8 <br /> 1 140 W. Hammer Lane, Stockton, California (Figure 1) <br /> Dear Mr. Knoll: <br /> As we discussed Ground Zero Analysis, Inc. (Ground Zero) is submitting this workplan on behalf <br /> of Mr. Carl Knowles to abandon groundwater monitoring wells at the subject site. As <br /> recommended in our June 28, 2001 Feasibility Study Report, Ground Zero proposes to destroy <br /> wells MW6 and MW7 by pressure grouting. Also as we discussed, Ground Zero is proposing to <br /> destroy well MW8 by pressure grouting based upon historical analytical results. Well MW8 is <br /> located within the footpring of the proposed road widening project along that stretch of Thornton <br /> Road. Monitoring well locations are shown on Figure 2. Monitoring well construction details are <br /> presented in Table 1. Copies of well logs are included in Attachment A. <br /> Prior to abandonment, each well will be monitored to ensure no obstructions are present. To <br /> abandon the wells neat cement grout will pumped continuously into each respective well until <br /> completely full, unless conditions in the well(s) dictate that sealing operations be conducted in a <br /> staged manner. Additional cement will then be added to each well under pressure in order to <br /> force the grout through the slots of the screen and into the filterpack, ensuring an adequate seal. <br /> Pressure will be applied to each well for a minimum of 15 minutes after completely filling the well <br /> with cement grout. <br /> The well boxes and upper well casing will be removed to at least 18 inches. Grout used to seal <br /> the wells will be allowed to spill over into the respective voids and finished to grade. <br /> G:\Data\GRO[TNDZE\KNOWLES.HAM\REPORTS\W ELLDST.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.