Laserfiche WebLink
1 <br /> ZNMA <br /> Working To Restore Nature <br /> groundwater extraction flow rates, pH, conductivity, temperature of groundwater, and <br /> contaminant concentrations. <br /> 11,0 SCHEDULE <br /> ' The estimated timeframe to complete the tasks discussed in the previous section are as follows. <br /> ' TASK ESTIMATED COMPLETION DATE <br /> Approval of CAP October 31, 1994 <br /> ' Solicit Bids November 30 1994 <br /> ' Select Consultant January 15, 1995 <br /> System Design February 28, 1995 <br /> System Permitting March 31, 1995 <br /> System Installation April 30, 1995 <br /> ' Startup and Source Testing May 31, 1995 <br /> Begin System Operation and Maintenance May 31, 1995 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1-"W8\P"0R'B\CAP-W94 DRF 25 <br />