My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
5451
>
2900 - Site Mitigation Program
>
PR0505722
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:03:05 AM
Creation date
1/30/2020 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505722
PE
2951
FACILITY_ID
FA0006961
FACILITY_NAME
KJAX
STREET_NUMBER
5451
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
10122041
CURRENT_STATUS
02
SITE_LOCATION
5451 E HARDING WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'4 <br /> 3.0 <br /> PROJECT ORGANIZATION AND-RESPONSIBILITIES <br /> CWCFS anticipates that a relatively small team will be required to perform the required activities <br /> r under the work assignment. Responsibilities are as follows: <br /> WCFS Project Manager, <br /> Harry P. Butler Implement necessary action to accomplish program and project objectives. <br /> COversee project performance to ensure contract and program compliance. <br /> WCFS Task Manager, <br /> Michael Sartor Manage project performance and provide technical expertise to accomplish <br /> objectives. Ensure that project tasks are successfully completed within the <br /> projected time periods. <br /> WCFS Health and Safety Officer, <br /> Janice Ruggles Provide technical assistance as required to ensure worker safety and <br /> resolve on-site health and safety issues requiring corrective action. <br /> Review and approve Health.and Safety Plan. <br /> WCFS Field Team Leader, <br /> William Loskutoff Conduct field operations in accordance with approved work plan. Ensure <br /> that all protocols (including chain-of-custody, sample collection And <br /> labeling, sample storage and shipping,instrument calibration) are followed <br /> as required. Recognize and implement necessary corrective actions. <br /> Document field operations. Ensure that QC guidelines are followed to <br /> avoid any compromise of sample integrity. Ensure that health and safety <br /> r procedures are`followed to avoid risk to sampling personnel. <br /> L� <br /> WCFS Project Chemist, <br /> C. Scott Goulart Provide technical assistance to accomplish project objectives, including <br /> suggestions for correcfive action. Perform validation of data generated by <br /> off-site laboratory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.