My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:53:34 AM
Creation date
1/30/2020 10:33:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY Unit 5u ervisors. <br /> ..Co P <br /> z.r-`:• ., ' 3'•2 Donna K.Heran,R.E.H.S. ' Turd F1o0I Carl Borgman,R.E.H.S. <br /> Q:. � 304 East Weber Avenue, <br /> �*. i}. Director 1 Mike Huggins,R.E.H.S.,R.D.1: <br /> Al Olsen,R.E.H.S. Stockton,;California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • C1.7. --. �e Program Manager Tele hone. (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Q�� oR�' P Robert McClellon,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Fax: (209) 464-0138 <br /> s Program Manager Mark Bareellos,R.E.H.S. <br /> JOE ALDRIDGE FILE Copy <br /> ULTRAMAR INC <br /> 685 W THIRD STREET <br /> HANFORD CA 93230 <br /> RE: Beacon #641 <br /> SITE CODE: 1125 <br /> 1210 E. Hammer Lane ROM 000070 <br /> Stockton, CA <br /> WORK PLAN: "Additional Groundwater Investigation and Installation of <br /> Interim Soil Vapor Extraction (SVE) System". <br /> DATED: September 9, 2002. <br /> PREPARED BY: Horizon Environmental Inc. - Rexford K. Smith, RG#5307 <br /> STATUS: APPROVED with comments noted below. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN_[H&S <br /> 25299.37, subd(c)(3�L <br /> Under dual-phased approach, install four onsite CPTs and one <br /> offsite CPT to approximately 100' bgs in Phase I and collect and <br /> analyze soil and groundwater samples for lateral and vertical <br /> delineation of petroleum impact to subsurface as required by EHD <br /> and, <br /> • Based on results of CPT findings, install PVC monitoring wells in <br /> Phase II under a work plan addendum at depths of concern and <br /> develop, survey, and add new wells to existing quarterly monitoring <br /> and reporting requirements and, <br /> if <br /> • Under "Interim remedial action'.", install PVC piping to existing vapor <br /> extraction wells, install SVE unit, operate and test under San <br /> Joaquin County Unified Air Pollution Control permits, and report <br /> findings to EHD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.