My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:53:34 AM
Creation date
1/30/2020 10:33:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Beacon # 641 page 2 <br /> 1210 E. Hammer Lane, Stockton, <br /> COMMENTS AND CONDITIONS: <br /> • Interim remedial action NOT directed by EHD and evaluation of <br /> effectiveness required by EHD (not longer than six months from <br /> system start up) and prior to SVE being considered as full remedial <br /> action and, <br /> • Existing wellheads on and offsite in disrepair. Traffic boxes broken, <br /> grout missing inside boxes, and watertight caps missing and <br /> ineffective at all wells as evidenced by surface drainage staining <br /> inside of casings. Immediate wellhead protection required. Locking <br /> watertight caps for all wellheads to be installed immediately. <br /> • Grouting and traffic box repairs to be included in Phase 11 as piping <br /> and system connections are completed. <br /> • Submit EHD well permit applications, fees, and offsite access <br /> agreement prior to scheduling CPT start date. <br /> • Submit SJCU-APCD permit to construct and to operate to EHD when <br /> issued. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN [H&S 25299.37 <br /> subd(c)(3)l: <br /> • none <br /> 1-.-"!!�e <br /> DATED: September 24, 2002 BY: <br /> Michael Infurna, Serkr REHS (209) 468-3454 <br /> [X] - Faxed to consultant on: ?12qlL <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.