Laserfiche WebLink
Beacon # 641 page 2 <br /> 1210 E. Hammer Lane, Stockton, <br /> COMMENTS AND CONDITIONS: <br /> • Interim remedial action NOT directed by EHD and evaluation of <br /> effectiveness required by EHD (not longer than six months from <br /> system start up) and prior to SVE being considered as full remedial <br /> action and, <br /> • Existing wellheads on and offsite in disrepair. Traffic boxes broken, <br /> grout missing inside boxes, and watertight caps missing and <br /> ineffective at all wells as evidenced by surface drainage staining <br /> inside of casings. Immediate wellhead protection required. Locking <br /> watertight caps for all wellheads to be installed immediately. <br /> • Grouting and traffic box repairs to be included in Phase 11 as piping <br /> and system connections are completed. <br /> • Submit EHD well permit applications, fees, and offsite access <br /> agreement prior to scheduling CPT start date. <br /> • Submit SJCU-APCD permit to construct and to operate to EHD when <br /> issued. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN [H&S 25299.37 <br /> subd(c)(3)l: <br /> • none <br /> 1-.-"!!�e <br /> DATED: September 24, 2002 BY: <br /> Michael Infurna, Serkr REHS (209) 468-3454 <br /> [X] - Faxed to consultant on: ?12qlL <br /> i <br />