My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:53:34 AM
Creation date
1/30/2020 10:33:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> I <br /> Ultramar <br /> i <br /> Ultramar,16C. Telecopy: 209-585-5685 Credit <br /> P.O.Box 466. 209-583-3330 Administrative <br /> 525.W.Third Street 209-583-3302 Information Services <br /> Hanford,CA 93232-0466 209-583-3358 Accounting <br /> (209)582-0241 $ <br /> S <br /> DATE REPORT SU BMITTED;'August 19, 1999 <br /> QUARTER ENDING: June 30, 1999 . <br /> SERVICE STATION NO.: 641 <br /> ADDRESS: 1210 East Hammer Lane, Stockton; California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Joseph A. Aldridge TEL. NO: 559-583-3231 <br /> BACK_GROUND: <br /> In June 1996, the underground storage tanks were removed.and replaced with double-wall <br /> tank systems. Soil samples collected from beneath the former tank locations contained <br /> petroleum hydrocarbons. <br /> Five-groundwater' 'monitoring Wells, one air-s..arge,well, and.eight vapor extraction wells were <br /> installed in 1996 and 1997. 'The monitoring wells have been sampled quarterly since October <br /> 1997, <br /> A Work Plan for:further groundwater-assessment was submitted in April 1999. <br /> SUMMARY OF THISQUARTER'S ACTIVITIES: I' <br /> Doulos Environmental..conducted-ground water monitoring on June'2, 1999. Groundwater <br /> samples were collected from the five existing monitoring wells, one air-sparge well, and-three <br /> vapor extraction wells. <br /> An encroachment permit application was submitted to the City of Stockton for a proposed <br /> monitoring well- A bond was also issued for the well. The City of Stockton made no <br /> progress in approving the permit, <br /> .RESULT-OF QUARTERLY MONITORING: <br /> Benzene and MTBE were detected in groundwater samples collected from the UST area and <br /> the off-site monitoring well west of the USTs. <br /> PROPOSED ACTIVITY FORNEXTQUARTER: ESTIMATED COMPLETION DATE <br /> Perform quarterly groundwater.monitoring September 1999 <br /> Further Groundwater Assessment Waiting for encroachment permit. <br /> BEACON <br /> j A Member of the Ultramar Group-of Companies #1 Quality and service z <br /> Ultramar <br />
The URL can be used to link to this page
Your browser does not support the video tag.