Laserfiche WebLink
a <br /> 1210 E. HAMMER, " ' <br /> BEACON # 641 2 <br /> DATE NAME ACCT HRS. COMMENTS <br /> CODE <br /> 04/29/9fi <br /> Database to "Remedial,Phase" and <br /> cont'd "Preliminary Assessment" completed. <br /> 04/30/96 M. Infurna 215 0.6 Call with questions on Public Participation. <br /> Mi explains procedures and site specific <br /> details. <br /> 05/20/96 M. Infurna 210 0.9 MI by site to verify end of public period and <br /> to remove posted signs. Mail check for <br /> requests for hearing. None rec'd, but i. <br /> lastest mail is dated 5116, Thursday. Will <br /> check for one more day. <br /> 05/23/96 M. Infurna 215 0.0 MI checks mail. No requests for hearing <br /> received for period ending 5117. Pub-Part <br /> clears. OK to proceed. No charge to RP. <br /> 05/30/96 M. Infurna 212 0.0 MI calls and leaves message on Horizon <br /> voice mail that Pub-Part passes and to call <br /> MI to schedule dates for work to start. No <br /> charge to RP. <br /> 06111/96 H. Knoll 215 1.5 Harlin Knoll covers site inspection for MI in <br /> RBCA training in Sacramento. HK confers <br /> with.UGT unit for procedures prior to field <br /> inspection. <br /> Y <br /> 06/11/96 H. Knoll 210 3.0 HK at site for tank removals and witnesses <br /> soil sampling procedures and notes strong <br /> petroleum odors in soil below former tanks. <br /> 06/12/96 H. Knoll 210 3.0 HK onsite for soil and stockpile sampling. <br /> Over/excavation sampling also. <br /> 06/12/96 H. Knoll 215 1.5 HK finishes field reports and files info with <br /> MI and all into file. <br /> 06/13/96 M. Infurna 210 1.1 MI on site to verify conditions. No line o/ex <br /> visible. Conditions discussed with tank pull <br /> contractor, Mike Collier of Walton Eng., <br /> IJr <br /> Y <br /> i <br /> hj pyp ' <br /> i` <br />