Laserfiche WebLink
d: <br /> 1210 E. HAMMER, <br /> BEACON # 641 3 <br /> DATE NAME ACCT HRS. COMMENTS <br /> CODE ; <br /> 06/13/96 and conductor casings need and <br /> cont'd placement also gone over. <br /> 06/13/96 M. Infurna 212 0..4 MI calls Randy Stephensen to discuss <br /> placement of conductor casings prior to <br /> new tanks placement for future wells and <br /> confirmation borings at end of remediation. <br /> Randy to send proposal with map and <br /> specifications as soon as possible. <br /> 06/13/96 H. Knoll 210 2.0 HK onsite for verification of contaminated <br /> soil stockpile management and liquid waste <br /> recycling. <br /> 06114196. M. Infurna 212 0.4 Phone conversation with Randy concerning <br /> placement of conductor casings, interim <br /> versus full remediation, and EHD need to <br /> approve any other corrective action prior to <br /> enactment. Vapor testing is OK, but not <br /> after high number of vapor wells in already. <br /> Fax'ed site map received today showing <br /> locations of 10, 16" o.d. PVC conductor <br /> casings, five for borings and wells now and <br /> five for confirmation borings at the end of <br /> remediaiton. <br /> 06/18/96 M. Infurna 212 1.1 After site visit today, MI notices piping still <br /> onsite and back at office MI calls to Randy <br /> to discuss the product line trenches and if <br /> over-excavation was done there. No olex <br /> at piping area done and stockpiled soil now <br /> gone from site. Randy explains that soil <br /> removed based on lab results and <br /> paperwork to be in removal report. <br /> 06/19/96 M. Infurna 215 0.7 MI prepares general comment letter for <br /> MTBE for all sites and charge each site <br /> partially for time. <br /> 06/20/96 L. Begley --- 0.0 LOP secretary mails off comment/MTBE <br /> letter to Ultramar after Margaret Lagorio <br />