My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:53:34 AM
Creation date
1/30/2020 10:33:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 - HORIZN ENVIRONMENTAL INC. <br /> L' .Specialists in.Slte.Assessment, Remedial Testing,.DesrkomT, loEtl.31 <br /> -July 8, 1996 96 JUL AM 10' 10 <br /> _. 1VIr. Michael J..Irifurna, R.E.H.S. <br /> Environment:Health Division <br /> Public.-Health Services'San.Joaquin County <br /> P.O.-Box 388 <br /> Stockton, California 95201-0388 1 <br /> Subject: Boring/Well Permit Application . <br /> Beacon Station No. 641,..1.2.10 East Hammer Lane, Stockton, California. <br /> - -Mr. Infurna: <br /> As we discussed, we have enclosed an application for installing borings/monitoring wells for <br /> the above-referenced site. This work is described in the Site Work Plan submitted dated <br /> June 24, 1996. Also enclosed.is a copy of the Site Safety Plan and check in the amount of <br /> $89. <br /> Due to ongoing construction of,the new canopy we have scheduled Arilling of the area <br /> beneath the new.canopy for Wednesday July 17, 1-996. The new canopy is scheduled to be <br /> installed_ on July 18. Any additional borings onsite that can't be completed will be <br /> completed during an additional mobilization:'-In-addition, the permits and scheduling of the <br /> offsite boring will be scheduled at a later date. <br /> Please call" Horizon at 916-.93972170 if you have any questions or require additional <br /> '"inforrnation. <br /> Sincerely, <br /> - Horizon Environmental Inc. <br /> Gary . Barker <br /> Senior;Project Manager <br /> Attachinents: :Site Safety Plan <br /> Check No.. 1284 <br /> Application For.Well//Pump/Site Plan <br /> CC' Mr. Randall Stephenson,Ultramar Inc. <br /> 5011 Golden foothill-Parkway,Suite 7 • EI Dorado.Hills,CA 95762 . (916)939-2170 • FAX(916)939-2172 <br /> P.O. Box 5283 • Bakersfield,CA 93388 (805)589-8389 • FAX(805)589-1456 <br />
The URL can be used to link to this page
Your browser does not support the video tag.