My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002053
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
ARCHIVED REPORTS_XR0002053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:39:09 AM
Creation date
1/30/2020 10:53:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002053
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Beacon Station No 641 April 22, 1999 <br /> Stockton California Work Plan <br /> f <br /> i SCOPE OF WORK <br /> To evaluate the horizontal and vertical extent of gasoline-range hydrocarbons in the soil and <br /> groundwater beneath the site, Horizon proposes to perform the following scope of work <br /> Task 1 Obtain well permits from the SJC PHS/EHD, obtain an encroachment permit <br /> from the SDPW, obtain an offsite access agreement from the property <br /> owner(s) to the west of the site, prepare a site-specific safety plan, notify <br /> Underground Service Alert (USA), and schedule contractors <br /> Task 2 Utilizing a truck-mounted dnlling rig equipped with hollow-stem augers, drill <br /> five 8-inch diameter soil bonngs (13-3 and MW-6 through MW-9) at the <br /> locations shown on Figure 2 During advancement of the borings, soil <br /> samples will be collected with a California modified split-spoon sampler and <br /> subjectively analyzed using an organic vapor meter (OVM) at 5-foot intervals <br /> or less <br /> 2.1 The initial boring to be drilled, B-3, will be to evaluate the lateral definition of <br /> gasoline hydrocarbons detected in soil borings B-1 (wells VW-3 and VW-4) <br /> and B-2 (well MW-1) Gasoline-impacted soil had previously been delineated <br /> to less than 3 ppm (TPHg) in two consecutive 5-foot sample intervals in both <br /> borings B-1 and B-2 (Appendix B Table 1, as reported by Horizon on <br /> December S, 1997) If subjectively field-screened soil samples indicate <br /> possible gasoline hydrocarbon impact at 55 feet bsg, then boring B-3 will be <br /> advanced until subjective screening with the OVM indicates no hydrocarbon <br /> impact in two consecutive soil samples Upon completion, the boring will be <br /> abandoned by placing a bentonite/neat cement grout from the bottom of the <br /> boring to surface grade in one continuous operation The grout will be placed <br /> utilizing a tremie pipe or through the augers <br /> 1641-14 wp 4 HORIZON ENVIRONMENTAL INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.