Laserfiche WebLink
y., <br /> Mr. Daniel Decker • - 2 - 8 February 2005 <br /> Regional Board staff concurs with the proposed baseline levels as attached and listed in Table 5 <br /> of the Baseline Report. As required by the Order, the Pilot Study Implementation Report is due <br /> no later than 60 days after completing the GZVI injections. This due date will be set and <br /> confirmed by email correspondence. The next monitoring report is due by 30 April 2005. If you <br /> have any questions, you may contact me at (916)464-4719 or dlewis@waterboards.ca.gov. <br /> LJ� XVV 4 <br /> DEVRA LEWIS <br /> Environmental Scientist <br /> Attachment <br /> cc: Mr. Jeff Wong, San Joaquin County Health Department, Stockton <br /> Ms. Linda Huff, Huff&Huff, LaGrange, Illinois <br /> Mr. Bill Zech, French Camp Grain Elevator,French Camp <br /> Mr. Joe Weidmann, Haley&Aldrich, Inc., San Diego <br />