Laserfiche WebLink
Mr. Daniel Decker r - 2 - 9 22 June 2001 <br /> 6. Additional information is needed on water supply wells PW-01 and PW-02 to determine whether <br /> they can provide beneficial information or if they are acting as a conductor for contaminants to <br /> reach deeper water bearing zones. <br /> 7. A submittal of an interim remedial action plan is premature at this time because the site is not <br /> sufficiently characterized. ContiGroup will provide a work plan with additional information on <br /> the two on-site water supply wells and provisions to collect groundwater samples for general <br /> mineral analyses, delineate the contaminant plume to the northwest and southeast of the property, <br /> and conduct pump tests. <br /> By 6 July 2001,please provide a work plan as discussed above with a schedule for implementation. If <br /> you have any questions, you may contact me at (916) 255-3119 or lewisd(a)rb5s.swrcb.ca.gov. <br /> aQll�_X_e � <br /> DEVRA LEWIS <br /> Environmental Specialist H <br /> cc: Mr. Jeff Wong, San Joaquin County Health Department, Stockton <br /> Ms. Linda Huff, Huff&Huff, LaGrange,Illinois <br /> Mr. James Wells, Haley&Aldrich, Inc., San Diego <br />