Laserfiche WebLink
Mr. Daniel Decker • - 2 - • 25 August 2000 <br /> continuous core samples from 10 feet above the top to 10 feet below the proposed bottom of the <br /> 'wells. Additionally, the zone where the conductor casing is set will need to be continuously cored <br /> about three feet above to no more than two feet below the clay/sand interface. <br /> 5. CGCI will install one of the proposed wells within a Caltrans right-of-way. CGCI needs to copy <br /> the Board(cover letter only) on any written correspondence with Caltrans. <br /> 6. CGCI needs to submit a schedule to complete the work outlined in the Work Plan. The schedule <br /> shall also include the submittal date for an interim remedial action plan. <br /> Enclosed is a draft monitoring and reporting program(MRP) for your review and comment. Until the <br /> MRP is finalized, CGCI shall monitor existing groundwater monitoring wells on a quarterly basis. <br /> By 15 September 2000, please submit comments on the draft MRP and a revised Work Plan that <br /> includes an alternative,reconnaissance soil investigation, the requested well details for the dual <br /> completion wells, and a schedule to conduct the work and submit a site assessment report. The site <br /> assessment report shall be prepared in accordance with the attached Items To Be Included In A Site <br /> Assessment Report. <br /> If you have any questions regarding this project, you may call me at (916) 255-3077. <br /> PnginLeenngCGeo H <br /> s cratst <br /> Enclosures <br /> cc: Mr. Jeff Wong, San Joaquin County Health Department, Stockton <br /> Ms. Linda Huff, Huff& Huff, LaGrange <br /> Mr. Joe Weidmann, Ogden Environmental Services, Santa Barbara <br />