Laserfiche WebLink
Chronology for Continental Grain A Page 3 <br /> 1805 Harbor, Stockton March 22,2010 <br /> 09/16/09 On this date EHD discussed site closure with the Central Valley Regional Water <br /> Quality Control Board. <br /> 10108109. EHD requested closure {30 day concurrence letter)from the CVRWQCB. <br /> Th 10/30/09 A closure concurrence letter from the CVRWQCB was issued: <br /> 02/25/10 All on-site and off-site MWs were destroyed by.this date under EHD permit and <br /> inspection. <br /> I 03/15/10 A MW Destruction Report was completed by Huff and Huff on this date. <br /> 03/18/10 EHD prepared LOP file for final closure (NFAR). <br />`r <br /> I <br /> a <br /> i <br /> 1 . <br /> i <br /> F . <br /> A <br />