My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
3500 - Local Oversight Program
>
PR0545253
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 1:55:23 PM
Creation date
1/30/2020 11:30:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545253
PE
3528
FACILITY_ID
FA0009191
FACILITY_NAME
PENNY NEWMAN GRAIN
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
1805 HARBOR RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology for Continental Grain Page 2 <br /> March 22, 2010 <br /> 1805 Harbor Street . <br /> 0415-7104 Nine hydropunch borings HA1 —.HA9 and monitoring well.MW7 were completed <br /> during this time. <br /> 05/21/04 The date of the Report on Soil and.Ground Water lnvestigation prepared by <br /> Haley&Aldrich for the work conducted in April 2004. <br /> 10/05/04 The date of the Corrective Action Plan prepared by Geomatrix. <br /> 03/16/05 The date EHD received the CAP Addendum prepared by Huff & Huff Consultants <br /> dated March 2005. <br /> 05/10/05 The date of the EHD letter commenting on the CAP Addendum that excavation of <br /> the contaminated soil should extend deeper to 25 feet. <br /> 06/20/05 The date of the Soil Remediation Work Plan-Fom7er UST Area prepared by-AGE <br /> Consultants.. <br /> 07/07/05 The date of the EHD letter approving of excavation of the contaminated soil. <br /> 08/16/05 On this date' MW MW 2 was-destroy ed, because it was located in the area to be <br /> � <br /> excavated. <br /> 0915-29105 During this time the CAP was implemented and approximately 1200 cubic yards <br /> of soil was excavated to a depth of 25 feet. <br /> f 11/09/05 On this date monitoring well MW2R was installed to replace MW2. <br /> 02/02/06 Date of the Quarterly report that discusses.the installation of MW2R in November <br /> 2005. <br /> 08/29/06 The date of Corrective Action Report that discusses the August, September and <br /> November 2005 work: <br /> 10/10/07 The date of the EHD letter requiring additional investigation. <br /> 02119-22108_ A CPT boring to 85 feet, monitoring wells MW10 —MW12 and four soil vapor <br /> points were completed during this lime., <br /> 04/22/08 The date of Additional.Site Assessment report that discusses the February 2008 <br /> work, <br /> 06/15/09 The date of the Closure Summary Report prepared by AGE. <br /> 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.