My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
3500 - Local Oversight Program
>
PR0545253
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:05:17 PM
Creation date
1/30/2020 11:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545253
PE
3528
FACILITY_ID
FA0009191
FACILITY_NAME
PENNY NEWMAN GRAIN
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
1805 HARBOR RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Technology SITE SAFETY PLAN <br /> l <br /> Job Name: Continental Grain <br /> Job Location: 1805 Harbor Street, Stockton, California <br /> Client Name: Continental Grain <br /> Project Number: 62500.0001 <br /> General Work Description: Preliminary Site Investigation <br /> SSP Prepared by: Drew Van Allen <br /> On-site Safety Officer: Tom Lutterman <br /> Project Safety Officer: Jeanne Homsey <br /> This site health and safety plan (SSP) must be kept on-site and accessible to all pn-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by all on- <br /> site employees, subcontractors and visitors 'prior to entering the site. General safes work <br /> practices are identified in the Smith Technology Corporation's Injury and Illness Prevention <br /> Manual and apply to all Smith Technology work sites. <br /> The provisions set-forth in this SSP shall apply to Smith Technology employees and, any <br /> subcontractors working for Smith Technology;at the job site. All personnel working for Smith <br /> E Technology at the job site must read this SSP, and sign the attached Compliance Agreement <br /> before entering the work area. Field personnel may deviate from the safety provisions set-forth <br /> in this SSP, but only to upgrade or increase the safety requirements. Smith Technology <br /> personnel may suspend work if unsafe working conditions are identified or observe d, or <br /> unauthorized modifications to the safety provisions set-forth in this SSP are made. If changes <br /> in site or working conditions require changes in safety procedures, appropriate amendments to <br /> this SSP will be provided by the Smith Tecl4nology project manager or supervisor.., with the <br /> written approval of a Smith Technology project safety officer or the Smith Technology Health <br /> and Safety Director. <br /> PAGE 3 <br /> p 1 f <br />
The URL can be used to link to this page
Your browser does not support the video tag.