Laserfiche WebLink
r r <br /> i <br /> ATCAssociates SrrE SAFETY-PLAN <br /> j <br /> On-site communications: 0 Radio 0 Verbal ❑Hand Signals <br /> ❑Other <br /> Designate hand signals here: <br /> Off-site communications: T3Radio ® Telephone <br /> ❑Other <br /> The specific signal for an emergency is: Verbally Given F <br /> i <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be._determinea on-site prior to.beginninq„work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP - OCHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment <br /> (i.e., gloves, coveralls) will be placed in 55-gallon <br /> drums and stored onsite with drill cuttings, F <br /> I <br /> Location of Wash Water: Restroom on-site <br /> f <br /> Location of Toilet: Restroom on-site <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP L7 CHECK WHEN <br /> DONE M <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced during drilling f <br /> activities will be stored on-site until disposal <br /> methods are determined. Excavated soil will <br /> be immediately transported and disposed of <br /> off-site. i <br /> f <br /> PAGE 11 <br />