My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8925
>
2800 - Aboveground Petroleum Storage Program
>
PR0528878
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 10:43:26 AM
Creation date
1/30/2020 12:07:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528878
PE
2832
FACILITY_ID
FA0017954
FACILITY_NAME
RAMOS OIL CARD LOCK
STREET_NUMBER
8925
Direction
W
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00120078
CURRENT_STATUS
01
SITE_LOCATION
8925 W THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q U I N Environmental Health Department <br /> C_�u ;� i ISI <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> RAMOS OIL CARD LOCK 8925 W THORNTON RD, THORNTON January 23, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 612 CFR 112.7(c)Plan failed to include secondary containment, diversionary structures,or equip to prevent discharge. <br /> The facility has buried piping and general secondary containment for the piping is not discussed. <br /> Provide appropriate containment and/or diversionary structures or equipment to prevent a discharge as described in <br /> §112.1(b), except as provided in paragraph (k)of this section for qualified oil-filled operational equipment, and <br /> except as provided in §112.9(d)(3)for flowlines and intra-facility gathering lines at an oil production facility.The <br /> entire containment system, including walls and floor, must be capable of containing oil and must be constructed so <br /> that any discharge from a primary containment system, such as a tank,will not escape the containment system <br /> before cleanup occurs. In determining the method, design, and capacity for secondary containment,you need only <br /> to address the typical failure mode, and the most likely quantity of oil that would be discharged. Secondary <br /> containment may be either active or passive in design.At a minimum, you must use one of the following prevention <br /> systems or its equivalent: <br /> (1)For onshore facilities: <br /> (i) Dikes, berms, or retaining walls sufficiently impervious to contain oil; <br /> (ii)Curbing or drip pans; <br /> (iii)Sumps and collection systems; <br /> (iv)Culverting,gutters, or other drainage systems; <br /> (v)Weirs, booms, or other barriers; <br /> (vi)Spill diversion ponds; <br /> (vii) Retention ponds; or <br /> (viii)Sorbent materials. <br /> (2)For offshore facilities: <br /> (i)Curbing or drip pans; or <br /> (ii)Sumps and collection systems. <br /> The SPCC plan should address appropriate containment and/or diversionary structures or equipment to prevent a <br /> discharge, except for qualified oil-filled operational equipment when other requirements are met, and except for <br /> flowlines and intra-facility gathering lines at an oil production facility. <br /> This is a Class II violation. <br /> FA0017954 PRO528878 SCO01 01/23/2020 <br /> EHD 28-01 Rev.9/20/2019 Page 6 of 8 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.