Laserfiche WebLink
j Case Closure Summary Pages %%010 <br /> Leaking Underground Fuel Storage Tank Program <br /> III Release and Site Characterization Information continued <br /> Maximum Documented Contaminant Concentrations --Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH(Gas) 5900 0.67 2.6 <0.05 Xylene 1000 0.068 0.330 <0.0005 <br /> TPH (Diesel) 15000 <10.0 NA 0.120 Ethylbenzene 190 <0.005 0.036 <0.0005 <br /> Benzene 70 0.042 .790 0.0012 Oil&Grease NA NA NA NA <br /> Toluene 630 0.017 .150 <0.0005 Heavy Metals NA NA NA NA <br /> MTBE NA NA NA <0.0005 <br /> Comments: Soil Before result are from samples (T3A, P4)that were collected at the time of the UST and piping removal. <br /> Soil After results are from MW#2 at 19 feet below grade. Water Before results are from MW2 on 5/11/95. Water After <br /> results are from MW2 on 10/29/04. 700 cubic yards of soil was removed from the area of P4 (dispenser area)and was <br /> remediated on-site. No other remediation occurred at this site. Groundwater monitoring was conducted from 1993-2005. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?YES <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan?YES <br /> Does corrective action protect public health for current land use?YES <br /> Site management requirements:NA <br /> Should corrective action be reviewed if land use changes? NA <br /> Monitoring/Vapor wells: 0 Number Decommissioned:0 Number retained: 8 <br /> List enforcement actions taken: NOR SENT TO RP <br /> List enforcement actions rescinded: NA <br /> V. Local Agency Representative Data <br /> Name: Margaret Lagorio Title: Supervising REHS/Site Mitigation/LOP Unit IV <br /> Signature: Date: <br /> VI. Central Valley Regional Water Quality Control Board (RB)Notification <br /> Date Submitted to RB: Response Date: <br /> RB Staff: J. Barta f Respo e: <br /> Title: Eng. Geologist SpSO <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER, Shall be retained by the lead agency as part of the official <br /> site file. <br />