My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:33:14 PM
Creation date
1/30/2020 1:23:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br /> CHRONOLOGY <br /> GRANITE CONSTRUCTION CO. <br /> 10500 S HARLAN RD(APN: 193-270-03) <br /> 04/22/92 The date five underground storage tanks(USTs)were removed under Environmental <br /> Health Department(EHD)permit and inspection:two Gasoline,two Diesel,and one <br /> Waste Oil. <br /> 06/17/92 On this date soil analytical results were reviewed by EHD. Wallace Kuhl report dated <br /> May 12, 1992,had soil sample results that were positive for Gasoline and Diesel <br /> contamination. The highest gasoline contamination was found under the east end of <br /> Tank-3 and the highest diesel contamination was found under the dispenser island(P4). <br /> 06/18/92 EHD filed an Unauthorized Release Report and a Notification of Hazardous Waste <br /> Discharge Report on this date. <br /> 02/11/93 Date the site was placed in the LOP. <br /> 03/9-15/93 During this period three monitoring wells(MW 1-MW3)were installed and 17 soil <br /> borings(SB 1-SB 17)were drilled. <br /> 04/29/93 Date of report covering March 1993 work. Groundwater contamination was documented. <br /> 09/22-23/93 Three additional monitoring wells(MW4-MW6)were installed northeast of the former <br /> UST location during this period. <br /> 09/28/93 On this date 700 cubic yards of contaminated soil was removed from the former <br /> dispenser area and stockpiled south of the former UST area, 13 confirmation soil samples <br /> were collected from the excavation and all six monitoring wells were sampled. <br /> 12/02/93 Date of the"Report of Findings"for the work performed in September 1993. Soil and <br /> groundwater samples from MW4-MW6 were non detect for contaminants. Soil sample <br /> results from the excavation were positive for Diesel(13 ppm)and Motor Oil(26 ppm). <br /> 01/17/95 To further define the extent of groundwater contamination,MW7&MW8 were installed <br /> southeast and southwest of the former UST location. Boring B18 was drilled southwest <br /> ofBl6&B17. <br /> 01/24/95 MW7&MW and B18 soil and groundwater sample results were below detection limits. <br /> 04/07/95 Date of "Problem Assessment Report"with a well survey that identified only the 2 <br /> domestic wells on site. <br /> 02/16/99 bate of Groundwater Monitoring and Sampling Report. Groundwater samples were <br /> collected from MW 1 —MW4 on 1/9/98 and 12/17/98,analysis for MTBE was included <br /> and it was not detected. <br /> 08/18/99 The date of "Request for Closure Report". A new well survey identified 33 domestic <br /> wells within 2000 feet of the site. <br /> 11/29/01 Date of EHD letter requiring destruction of production well and connection of the facility <br /> to a public water supply. <br /> 9/17/04 Date the on-site dust control/production well was destroyed under EHD permit and <br /> inspection. The Granite facility has connected to the Lathrop Public Water Supply. <br /> 10/17/05 Date of No Further Action Request/Final Closure Report. The diesel and gasoline plume <br /> is defined and stable and the fuel oxygenates and gasoline additives analyzed for were not <br /> detected. All requirements in the EHD letter dated 11/29/01 have been met. <br />
The URL can be used to link to this page
Your browser does not support the video tag.