My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:45:54 PM
Creation date
1/30/2020 1:50:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products Compan, Ad ` <br /> 2000 Alameda de las Pulgas <br /> Mailing Address: Box 5811 ` _ , ,.( " <br /> San Mateo, California 94402 V, <br /> Telephone <br /> 1\v , <br /> Telephone 415 5712400 \ „ <br /> December 14, 1990 <br /> Diane Hinson <br /> San Joaquin Public ealth Services <br /> P.O. Box 2009, <br /> Stockton, California 9 201 <br /> Subject: Request fo lacement of Work at two ARCO sites on the San Joaquin Public <br /> Health Servi es Pilot Program. <br /> Ms. Hinson: <br /> ARCO Products Company (AR O) is planning to conduct an environmental investigation <br /> limited to evaluating soil for evi ence of gasoline hydrocarbons at the following ARCO <br /> Stations: (1) ARCO Service Stati 2076 at 800 Kettleman Lane in Lodi, and (2) ARCO <br /> Service Station 548 at 1612 Hamme Lane in Stockton. ARCO has scheduled the removal <br /> of the underground storage tanks at a site for the week of December 26, 1990, pending <br /> the approval of permits that were su itted by Barghausen Consulting Engineers, Inc. of <br /> Sacramento. ARCO is requesting tha you place the work at the site on the San Joaquin <br /> Public Health Services Pilot Program. a understand from Ms. Eloise Frick of Applied <br /> GeoSystems, from conversations with Carol Oz of your staff, that this request will <br /> expedite the regulatory process during to removal operations. <br /> II Applied GeoSystems has prepared a separat document for each of the subject sites titled <br /> Results of Initial Subsurface Environmental nvesti ation and Work Pian for Excavation <br /> During Tank Replacement which we are sub 'tting to your agency with this letter. Each <br /> document summarizes results of drilling soil bo ' ngs near the existing underground storage <br /> tanks and soil borings in the area of the prop sed tank cavity and discusses our field <br /> f procedures for the tank removal project. ARCO included the work plan for excavating <br /> to obtain authorization from your agency to excavat hydrocarbonous soil greater than 4 feet <br /> from the existing tank cavity during replacement op rations. <br /> j Thank you for your effort to expedite this project. Please call Eloise Frick at 916-452-2901 <br /> i <br /> if you have any questions regarding this request. <br /> Submitted by, <br /> Mr. Kyle A. Christie <br /> Environmental Engineer <br /> i <br /> APPG7025-D <br /> ARCO P.oduof a company Is a mmamn of ARammRmnhnamComvany (9-88) <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.