Laserfiche WebLink
ARCO Products Company <br /> I 2000 Alameda de la;: Pulgas <br /> Nan Nia no, California944 " <br /> San f47a9eo, C9i4rni94402 <br /> 'Telophom 4'@5 571 909 - <br /> ULC <br /> December 14, 1990 <br /> Diane Hinson <br /> San Joaquin Public Health Services <br /> P.O. Box 2009, <br /> Stockton, California 95201 <br /> Subject: Request for Placement of Work at two ARCO sites on the San Joaquin Public <br /> Health Services Pilot Program. <br /> Ms. Hinson: <br /> ARCO Products Company (ARCO) is planning to conduct an environmental investigation <br /> limited to evaluating soil for evidence of gasoline hydrocarbons at the following ARCO <br /> Stations : ( 1) ARCO Service Station 2076 at 800 Kettleman Lane in Lodi, and (2) ARCO <br /> Service Station 548 at 1612 Hammer Lane in Stockton. ARCO has scheduled the removal <br /> of the underground storage tanks at the site for the week of December 26, 1990, pending <br /> the approval of permits that were submitted by Barghausen Consulting Engineers, Inc. of <br /> Sacramento. ARCO is requesting that you place the work at the site on the San Joaquin <br /> Public Health Services Pilot Program. We understand from Ms. Eloise Frick of Applied <br /> GeoSystems, from conversations with Ms. Carol Oz of your staff, that this request will <br /> expedite the regulatory process during tank removal operations. <br /> Applied GeoSystems has prepared a separate document for each of the subject sites titled <br /> Results of Initial Subsurface Environmental Investigation and Work Plan for Excavation <br /> During Tank Replacement which we are submitting to your agency with this letter. Each <br /> document summarizes results of drilling soil borings near the existing underground storage <br /> tanks and soil borings in the area of the Droposed tank cavity and discusses our field <br /> procedures for the tank removal project. ARCO has included the work plan for excavating <br /> to obtain authorization from your agency to excavate hydrocarbonous soil greater than 4 feet <br /> from the existing tank cavity during replacement operations. <br /> Thank you for your effort to expedite this project. Please call Eloise Frick at 916-452-2901 <br /> if you have any questions regarding this request. <br /> Submitted by, <br /> Mr. Kyle A. Christie <br /> Environmental Engineer <br /> ARCO Products Company Is a DIvleloo of AIIenIIcAtchilaidCompany <br />