Laserfiche WebLink
i • <br /> Mr Kyle Christie Project 0805-140 03 <br /> • October 5, 1995 <br /> Page 8 <br /> POST FIELD ACTIVITIES <br /> • EMCON will prepare a report summarizing tank removal and replacement <br /> operations and present the results of well abandonment, well installation, <br /> aeration, and sampling activities <br /> DOCUMENT DISTRIBUTION <br /> We recommend copies of this report be distributed to the following <br /> Mary Meays <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P O Box 388 <br /> Stockton, California 95201-0388 <br /> Elizabeth Thayer <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road <br /> Sacramento, California 95827-3098 <br /> Please call if you have any questions regarding this report r\���RED G&Oeo <br /> Sincerely, JAY RJOHNSON <br /> EMCON <br /> NO 5867 <br /> 60 <br /> Claudio Avila R ohnson - - <br /> Project Geologist Senior Projec eologist <br /> R G 5867 <br /> Attachments Figure 1 Site Vicinity Map <br /> Figure 2 Generalized Site Plan <br /> Attachment Field Procedures <br /> SAN 1ARC0105481DESIGN\08051400 3AS-95 w9t 3 <br />