My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0002994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 8:19:42 PM
Creation date
1/30/2020 3:17:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002994
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: May 19,2003 <br /> Quarter: I" Quarter,2003 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 548 <br /> Address: 1612 Hammer Lane, Stockton, CA <br /> ARCO Environmental Engineer: Paul Supple <br /> Consulting Co./Contact Person: URS/Vernon Elarth <br /> Consultant Project No.: 38466082.00336 <br /> Primary Agency/Regulatory ID No.: Lori Duncan, San Joaquin County Environmental Health <br /> Department <br /> WORK PERFORMED THIS QUARTER (First 2003): <br /> 1. Performed quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Performed operation and maintenance of the SVE and AS systems. <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2003): <br /> 1. Perform quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> 3. Perform operation and maintenance of the SVE and AS systems. <br /> QUARTERLY RESULTS SUMMARY (First 2003): <br /> Current Phase of Project: Remediation <br /> Frequency of Groundwater Sampling: Wells MW-1 through MW-6 and VW-1 through VW-5 <br /> sampled Quarterly _ <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product (FP) Present Onsite: No <br /> FP Recovered this Quarter: None <br /> Cumulative FP Recovered to Date: 7 gallons <br /> Current Remediation Techniques: Soil vapor extraction and air sparging <br /> Approximate Depth to Groundwater: 11.04 to 29.34 ft - <br /> Groundwater Flow and Gradient: Southeast @ 0.03 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data(chain-of-custody records,blanks,dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results,and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following limitations: <br /> • The reported results for 8260B in sample VW-513 may be biased low since the analyses for these <br /> analytes were performed 8 days beyond the U.S.EPA recommended holding time of 14 days. <br /> • Elevated reporting limits were the result of dilutions performed by the laboratory in order to quantitate <br /> a target analytes. <br /> K:1Wpio ssV5 BY ARCOMS49\1 QTR 03\448 GWMR IQ03,dn Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.