My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> F <br /> and Safety code section 25296 (c). Any continuation of contamination or increase noted <br /> in a monitoring well system will result in the requirement that tanks be replaced with <br /> double contained tank systems. <br /> Single wall pressurized lines cannot be left in place unless they were put in under a <br /> permit from the EHD. If these lines were not installed under permit and inspection, the <br /> lines must be verified to have been properly installed by uncovering and inspection of the <br /> lines by a special inspector and this inspection observed by EHD staff_ Sampling of the <br /> line area will also be required in order to determined if any unauthorized release has <br /> occurred. Sampling is required and must be completed under EHD permit. (CCR Title <br /> 23 section 2660 (1) (k)) <br /> Any tank and line monitoring system to be proposed must be found listed in LG113#, <br /> and must meet the requirements of CCR Title 23 section 2666. This monitoring system <br /> must also provide pump shutdown upon leak detection. Per CCR Title 23 section 2660 <br /> (n) which refers to CCR Title 23 section 2635 (2A) (213) will apply to any corrosion <br /> protection system. <br /> Dispenser pans are required if any work is done to the piping and dispenser systems. <br /> If you have any questions regarding this matter, please contact me at(209)46$-3446. <br /> Karen Furst, M.D., M.P.H. <br /> Health Officer <br /> Doug Wilson, Supervising R.E.H.S. <br /> Environmental Health Division <br /> DW/dw <br />
The URL can be used to link to this page
Your browser does not support the video tag.