My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s - Page 1 of 3 <br /> Vicki McCartney [E."] <br /> From: Vicki McCartney [EH] <br /> Sent: Friday, December 02, 2011.3:10 PM <br /> To: 'Yan, Jose'. <br /> Cc: Francini, Catherine; Westhoff, Brian; Rangi, Aparjeet <br /> Subject: RE: Permits for.3202 W. Hammer Lane, Stockton, CA <br /> Hi Jose, <br /> Thank you for providing this information to me. I do not have to be present for air-knifing but an inspectormust be <br /> present for all of the well destructions-:.Based on the schedule included in your email below, I will not be needed <br /> h dule changes, lease let me know. <br /> until December 19 through 23 2011. if this sc e . , <br /> u g 9 p <br /> Do you know when the work will resume in January 2012? 1 will be on vacation from January 3 through 6, 2012, <br /> returning to work on Monday, January 9; 2012- 1 will need to arrange to have an inspector,onsite in my absence, <br /> -if fieldwork begins before January 9th; so if;you know the schedule in January, please let me know. <br /> Thank you <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton,California 95202 <br /> Phone: (209)468-9852 <br /> Fax: (209)468-3433 <br /> Email: vniccartney i':sjcehd:com <br /> From: Yan, Jose [mailto:Jose.Yan@stantec.com] <br /> i Sent: Friday, Decem _ber 02, 2011 2:38PM <br /> 4 To:.Vicki McCartney [EH] <br /> Cc: Francini, Catherine; Westhoff, Brian; Rangi, Aparjeet <br /> Subject: RE:. Permits for 3202 W: Hammer Lane,.Stockton, CA., <br /> Hello Vicki, <br /> Field work on Monday will start at 10 am to go.over.the health and safety meeting and then,proceed with <br /> air-knifing the well locations. Field work will start at 7 am thereafter.. The.Stan tec.contact on-site will be <br /> Brian Egger who could be reached at(916) 2961890. The scheduie for the project looks like the following <br /> and will let you know of any updates:. <br /> December 5 to 16, 2011 -Air-Knifewell locations <br /> December 19 to 23, 2011 -Start over drill/pressure grout <br /> January 2012-Continue over drill/pressure grout <br /> E - <br /> In regards to the moratorium on major street closures during the holiday, I attached a copy with this email, <br /> and it will last till January 2, 2012. 1 spoke to the City of Stockton and they will not allow for night work <br /> i either. Let us know if you have other questions/concerns. <br /> Jose Yan: <br /> Engineering Associate <br /> Stantec Consulting Corporation <br /> 57 Lafayette Circle 2nd Floor <br /> Lafayette CA 94549 <br /> 12/2/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.