My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:06:43 AM
Creation date
1/31/2020 8:38:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
remember, this site adjoins P/CP site that has been under 8v ne injection remediation <br /> for 5+ years. We have. previously submitted documents to. SJCEHD. illustrating similar. <br /> hydrogeologic conditions at the. two adjacent parcels. In our meeting, we. discussed with <br /> SJCEHD several instances in which. RWQCB has allowed ozone pilot-scale without. ozone-bench <br /> testing or WDR application, in -the event that a detailed monitoring plan and contingency <br /> plan are in place for the. pilot testing. Stratus has done ozone. pilot-scale without a WDR <br /> permit or bench-testing at sites approved by Vera Fischer (3900 Fruitridge, Sac) and <br /> Kristi Shelton (Ramos plant in Isleton) . Considering the. already-altered geochemical <br /> state (if it was going to happen at` all) of the subsurface by the BP/CP ozone system, <br /> SJCEHD approved us to. submit a work plan for the testing (including monitoring and <br /> contingency plans) . This work plan was submitted to SJC and you on June 22; SJCEHD <br /> approved the work plan in a letter dated July ,21 but their- approval was contingent on your <br /> approval. If you have not already reviewed the- work plan that was submitted to you in <br /> June, could you please do that and provide your input on our proceeding when you can. <br /> For your convenience,. I have attached the docs here. so you don't have to go hunting for <br /> them. I understand this'll have to. wait for -your return in December - hope you have a <br /> happy Thanksgiving! <br /> -sarah <br /> i <br /> Sarah 0. Salcedo, P.G. <br /> I <br /> Project Manager / Senior Geologist <br /> Stratus Environmental, Inc. <br /> 3330 Cameron Park Drive,. Suite 550 <br /> Cameron Park, California 95682 <br /> (530) 313-9966 -- office i <br /> (530) 676-6005 -- fax <br /> (775) 343-2295 -- mobile <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.