Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> �o-_,�•.'cp � Donna Heran,REHS <br /> r y 600 East Main Street <br /> a: ^� PROGRAM COORDINATORS <br /> < Stockton, California 95202-3029 Robert McCleflon, REHS <br /> • Jeff Carruesco,REHS,RDI <br /> Cq••..�-. 0 Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> �/FOR <br /> Phone: (209)468-3420 <br /> Fax: (209) 464-0138 <br /> July 21, 2010 <br /> Mr. Wesley Parkinson <br /> Parkinson's 1-5 ARCO Service Station <br /> 3250 West Hammer Lane <br /> Stockton, California 95209 <br /> Subject: Parkinson's 1-5 ARCO Service Station <br /> 3250 West Hammer Lane <br /> Stockton, California 95209 <br /> Dear Mr. Parkinson: <br /> The San Joaquin County Environmental Health Department (EHD) has reviewed Work <br /> Plan for Pilot-Scale 03IH2O2 Injection Test (work plan), dated 22 June 2010, prepared <br /> and submitted by your consulting firm Stratus Environmental, Inc. (Stratus) on your <br /> behalf for the above-referenced subject site. In the work plan, Stratus proposes to <br /> perform a ninety-day pilot test to determine whether ozone/hydrogen peroxide (03/H2O2) <br /> injection will reduce the concentrations of petroleum hydrocarbon contamination at your <br /> site and assess what affect, if any, this process will have on groundwater quality. <br /> The EHD approves the work plan that includes the installation of four proposed nested <br /> 03/1-12O2 injection wells (IW-1 through IW-4) and one proposed monitoring well (MW-7) at <br /> locations illustrated on Figure 3 of the work plan. Each of the four 03/H2O2 wells will <br /> contain two sparge points, one with a gas diffuser for 03 sparging installed from <br /> approximately twenty-one to twenty-three feet below ground surface (bgs), and one with <br /> a stainless steel slotted well screen for H2O2 injection installed from approximately <br /> eighteen to nineteen feet bgs. The proposed monitoring well (MW-7) will be screened <br /> from approximately ten to twenty-five feet bgs. <br /> During the initial thirty days of the pilot test, Stratus proposes to inject only 03 into the <br /> four 03/H2O2 wells in fifteen-minute cycles continuously for twenty-four hours per day. <br /> Based on the field conditions and preliminary results from the first month's pilot test, <br /> Stratus proposes to possibly increase the 03 injection cycles to twenty minutes during <br /> the second and third months. Stratus proposes to commence injecting H2O2 beginning <br /> the second month and continuing the H2O2 injections through the third month. Stratus <br /> estimates that approximately thirty-one to forty-five pounds of 03 and approximately one <br /> hundred-fourteen gallons of H2O2 will be injected into the groundwater over the course of <br /> the ninety-day pilot test. <br />