My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
riser pipe. A clean-washed, graded silicate sand will be placed around the well screen and to 1 to <br /> 2 feet above it. A transitional sand pack will be placed above that, followed by a layer of <br /> hydrated, manufactured bentonite. The transitional sand pack and bentonite layer will each be <br /> 1 to 2 feet thick. <br /> Both the screen slot width and filter pack and transition pack gradations will be selected <br /> following inspection of the log for CPT-3. <br /> A mechanically-mixed cement-bentonite slurry will be placed into the annular space between the <br /> PVC riser pipe and the inside of the conductor casing and brought to near-surface. It is expected <br /> that a higher strength cement may be placed at the top of the conductor casing, to tie together <br /> shallow soils, road subgrade,top of conductor casing, and the traffic box. <br /> Shaw will select and install materials in conjunction with a licensed C-57 contractor with <br /> low demonstrated expertise in such well constructions, and in accordance with state and county <br /> regulations and guidance. <br /> 3.6 Well Development <br /> The well will be developed by swabbing and bailing, no sooner than 36 hours after installation <br /> has been completed. Swabbing will consist of moving a vented surge block or large PVC bailer <br /> in up and down strokes, no more than three feet in length, beginning at the top of the screened <br /> +� well casing and progressing to the bottom of the well. The swabbing will be performed to draw <br /> fine sediments from the screen filter pack and into standing well water, to be removed by hand <br /> bailing. A minimum of five static well volumes of water will be removed from the well during <br /> development. The field measured parameters of pH, temperature, conductivity, and turbidity <br /> will be monitored. Development of the well is expected to be terminated when these parameters <br /> have stabilized. <br /> 3.7 Groundwater Sampling and Analysis <br /> One groundwater sample will be collected form the new well after it has been developed. The <br /> monitoring well will be purged prior to collection of a groundwater sample. A minimum of three <br /> static well casing volumes will be purged from the well using either a dedicated, disposable <br /> bailer, or a thoroughly-decontaminated pump or other system. During the purge process, pH, <br /> specific conductivity and temperature will be measured to ensure that fresh formation water is <br /> entering the wells prior to sampling. Purge water will be placed into a labeled, 55-gallon drum <br /> for on-site storage pending disposal. <br /> r� <br /> All groundwater samples will be collected from the well using a disposable bailer that is <br /> dedicated for use at that well, to prevent any potential for cross-contamination of samples. The <br /> N%� water samples will be transferred from the bailers into the appropriate laboratory supplied <br /> 60 <br /> SacDP-N.1sacDR20051PrA88018800401A5acWPParkinson.doc 3_3 <br /> 9.8.05 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.