Laserfiche WebLink
' Soil in the next sample tube (where available) should was to describe the lithology <br /> and measure volatile organic compound (VOC)concentrations Approximately <br /> half of the sample from the sample tube was removed and placed in a resealable <br />' plastic bag The plastic bag was set aside to allow VOCs, if present, to accumulate <br /> in the headspace above the sampled soil The headspace was then sampled using a <br /> portable photo-ionization detector(PID) The PID probe was inserted through a <br /> hole made in the plastic bag and the highest measurement encountered recorded on <br /> the boring log <br /> • Soil and wastewater generated during the field activities was contained in 55-gallon <br /> United Nations approved drums <br /> Well Construction Procedures <br /> • The monitoring wells were constructed of flush pointed, threaded, 2-inch I D , <br /> Schedule 40 polyvinyl chloride (PVC) casing The well casing was delivered to the <br /> 1 site in factory plastic wrap The casing had rubber or Teflon O-ring gaskets at the <br /> joints <br /> • The slotted interval consists of 0 020-inch machined slots The filter pack consists <br /> of#3 Monterey Sand The slot size and filter pack had been selected with the <br /> intent to minimize the amount of native lithologic and filter pack material entering <br /> the monitoring well <br /> • A bottom screw cap was placed on the bottom of the casing A 10 foot length of <br /> slotted casing was joined to the bottom screw cap The screened interval was set so <br /> that no more than 10 feet or no less than 7 feet of well screen is within the <br /> water-bearing zone Blank casing was used to construct the remainder of the well <br /> During placement of the filter pack, the well was suspended in the augers The <br /> augers were lifted 2 to 4 feet and the sand filter pack poured into the annulus The <br /> 1 augers were then slowly lifted with sand filter pack placed "continuously" until the <br /> sand is approximately 2 feet above the top of the screen <br /> The well was swabbed following placement of sand with a surge block Swabbing <br /> was conducted over the screened interval of the well casing, beginning at the <br /> bottom of the well Swabbing was conducted at least twice over the entire length <br /> of the well screen <br /> • An approximately 1 to 2 foot thick zone of bentonite was placed above the sand <br /> filter pack <br /> • The annulus above the bentonite was grouted with a cement slurry placed by <br /> tremmie if significant water is present in the boring The cement grout should <br /> extend to a depth of approximately 1 foot below the ground surface <br /> 1 <br /> N lrancfp]1ProjectslProjects1880104011a101101Assessment and Interim Remedial Report doe <br /> ' B-2 <br />