My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:11:07 PM
Creation date
1/31/2020 11:05:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Quik Stop Markets <br /> Project No. 62503.0003 February 1999 <br /> Page 1 <br /> PROJECT SAFETY PLAN <br /> FOR <br /> QUIK STOP MARKETS NO. 132 <br /> 3555 W. HAMMER LANE <br /> `" STOCKTON, CALIFORNIA <br /> `. 1. INTRODUCTION <br /> This Project Safety plan delineates the basic safety requirements for the completion of five soil borings <br /> 4, at the facility located at 3555 W. Hammer Lane, Stockton, County of San Joaquin, California (Figure <br /> 1). <br /> The site is a service station and convenience store facility. The underground storage tanks on the <br /> premises contained gasoline. ATC Associates Inc. (ATC's) work will include the drilling, sampling, <br /> and logging of five soil borings. <br /> V <br /> The provisions set forth in this plan will apply to the employees of ATC and its subcontractors <br /> working on the project. The subcontractors may elect to modify these provisions, but only to upgrade <br /> or increase the safety requirements, and only with the concurrence of ATC as designated and accepted <br /> in writing. <br /> The plan addresses the expected potential hazards that may be encountered during this project. Field <br /> activities will be scheduled with the San Joaquin County Public Health Services and are expected to <br /> last for approximately one day. If changes in site or working conditions occur as the activities process, <br /> amendments to this plan will be provided by ATC. <br /> 2. PROJECT SAFETY AUTHORITY <br /> Personnel responsible for the project safety are: James A. Lehrman, Project Manager and Bob Azam, <br /> Project Geologist. <br /> The Project Manager/Project Geologist is responsible for reviewing and authorizing the provisions of <br /> this plan. He has the authority to provide for the auditing of compliance with the provisions of this <br /> plan, suspend or modify work practices, and to administer disciplinary actions for individuals whose <br /> conduct does not meet the requirements set forth herein. The Project Manager/Project Geologist will <br /> ensure that the following items are adequately addressed: <br /> ■ Safety Supplies and Equipment Inventory <br /> ■ Medical Surveillance Program/Physical Examinations <br /> ■ Training Programs/Hazard Communication <br /> ■ Accident/Incident Reporting Procedures <br /> ■ Decontamination/Contamination Reduction Procedures <br /> WLEASANTON Oh EW AMQUIKSTOM132�je Sdoy Pl=n. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.