My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:11:07 PM
Creation date
1/31/2020 11:05:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Workp6.,For Additional Assessment and FeasiL.6, Study <br /> Quik Stop Market No. 132 <br /> 3555 West Hammer Lane <br /> Stockton, Califomia <br /> preparing a feasibility study to evaluate at least two remedial methods for reducing concentrations <br /> of MTBE at the site. <br /> SCOPE OF WORK <br /> The following scope of work has been proposed to meet the objectives: <br /> Task 1 Advance Borings and Collect Depth Discrete Groundwater Samples; <br /> Task 2. Install a Two Well Cluster to the East of Soil Boring SB-3; and <br /> Task 3. Prepare a Report of Findings and a Feasibility Study. <br /> WORK DESCRIPTION <br /> TASK 1 DEPTH DISCRETE GROUNDWATER SAMPLING <br /> In order to perform this investigation effectively and efficiently, preparations for the fieldwork will <br /> be made prior to mobilizing to the site. ATC will coordinate with key subcontractors including a <br /> subsurface utility locator, a drilling contractor, and a State certified analytical laboratory. The soil <br /> boring locations will be cleared prior to drilling by marking the location with paint and notifying <br /> Underground Services Alert (USA). A Soil Boring Permit will be obtained from the PHS/EHD. <br /> All project work will be performed under the direction of a California Registered Geologist <br /> Depth discrete groundwater samples will be collected from a total of six borings, at both on-site <br /> and off-site locations, in order to confirm the concentrations of petroleum hydrocarbons in <br /> shallow groundwater at the site. Five of the locations will be adjacent to existing groundwater <br /> monitoring wells, and one location will be east of Boring SB3 at a proposed groundwater <br /> monitoring well location (see Task 2). The proposed locations of the borings are shown on <br /> Figure 2. Off-site access will be obtained from the Taco Bell restaurant property owner and the <br /> Burger King restaurant property owner. <br /> ATC will retain the services of a licensed driller for advancing the boreholes using direct push <br /> technology. USA will be notified of the proposed drilling activities to ensure that no utility lines <br /> are located within the immediate vicinity of the soil borings. In addition, a sub-surface utility <br /> locator will be contracted to provide a subsurface survey of utility lines and other buried objects in <br /> and around the borehole locations. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.